Laserfiche WebLink
ds <br /> ined in Chapter <br /> f, PERFORMANCE STANDARDS:y conditions of the he Quaarry Excavation Permit? (Development <br /> be met <br /> unless otherwise modified y <br /> Title Section 9-1415.3[31) <br /> normally be 'carrid on <br /> g. HOURS OF OPERATION: Plant oDeratonsevello men#shaITitle Section 9-1415.e3(fl) during the <br /> hours from 5:00 a.m. and 9:00 P.M. ( p <br /> be in <br /> h, WEED CONTROL: It noxious we are an the rsn'9ssioneratof sSan II Joaguirzccordance County. <br /> with instructions from the Agricultural Com <br /> miss <br /> Title Section 9-1415.3 [h]) <br /> feet of an property line or right- <br /> i, SETBACKS: No excavation shall take place within 25 Y <br /> of-way (nor within the allowed slopes adjacent to said 25-foot setback) unless the <br /> elevation prior to excavation is more than that of the abutting property, in which case the <br /> elevation within said 25-foot setback shall at no time be less than that of the abutting <br /> property, at the property line. {Development Title Section 9-1415.3[j]) <br /> j, SLOPES: The following provisions do not apply to temporary interior cut slopes (i.e., <br /> working slopes that do not fall within any of the criteria listed below). Temporary interior <br /> cut slopes shall comply with the Cal OSHA Code of Regulations andlor the Federal <br /> OSHA Code of Regulations, as applicable. (Development Title Section 9-1415.3[k]) <br /> d with a <br /> (1) TerracingRe aired. All slopes een terraces of 50 feet. Eacht erraceeor bench <br /> maximum vertical distance <br /> shall be a minimum of 12 feet wide. <br /> (2) Terrace ❑rains e. Drainage plans with calculations shall be submitted for <br /> approval to the Development Services Division for all terraces as part of the <br /> Reclamation Plan. <br /> nd <br /> Terraces for reclaimed final slopes s{�El be col[ectionepa�is whereack it can entes the fill r cath <br /> designed such that runoff is directed <br /> basins and be conveyed via pipes or other acceptable conveyance to he toe of <br /> slope. The spacing of collection points shall be no greater than 1,500 feet, and <br /> each reclaimed final slope face that has terracing shall have a minimum of one <br /> down drain. The method of transporting the water along the flow line of the <br /> terrace to the down drain, so as to prevent erosion and possible slope failure, <br /> shall be approved by the Development Services Division. <br /> The method of drainage of terraces for temporary slopes at setback lines shall <br /> be submitted to the Development Services Division for approval. <br /> a <br />� R <br /> -15- <br />