Laserfiche WebLink
F <br /> n. EXCAVATIONIRECLAMATION SCHEDULE: The reclamation plan shall shove the <br /> phases of excavation. Reclamation on one phase of an excavation shall be initiated <br /> prior to the start of the next excavation phase. The final reclamation of any •phase of <br /> excavation shall be completed within two years of the commencement of the <br /> reclamation process. Excavation shall be limited so that at any point of time a maximum <br /> of one phase is being reclaimed while one phase is being excavated. (Development <br /> Title Section 9-1415.3[0]) <br /> o. TIME LIMITATION: The Quarry Excavation Permit shall remain in effect as longe the <br /> excavation continues in compliance with the approved Permit but not to exceed 56 <br /> a years. (Development Title Section 9-1415.3 [p]) <br /> P. ANNUAL INSPECTION REPORTS: Annual inspections of the excavation shall be <br /> conducted by the County to ensure compliance with the conditions of the permit and the <br /> reclamation plan. The County may use professional services as provided for in Section <br /> 9-240.11. The consultant shall be selected by San Joaquin County. Upon completion of <br /> the annual inspection, the person in charge of the mining operation shall submit to the <br /> State Geologist and the County a report which shall contain all the information as <br /> required by Section 2207 of the Public Resources Code. The cost of the inspection shall <br /> be paid by the mine operator. Additional inspections may be conducted, but the cost of <br /> additional inspections shall be paid for by the mine operator only if non-compliance with <br /> the conditions of the Quarry Excavation Permit or the reclamation plan is found. <br /> (Development Title Section 9-1415.3(q]) <br /> q. PERFORMANCE GUARANTEE: In order to ensure reclamation of the site, compliance <br /> with conditions of approval, and compliance with County and State mining regulations, <br /> the applicant shall provide performance guarantees as a condition of the issuance of the <br /> a <br /> Quarry Excavation Permit. The amount and form of the guarantee shall be subject to <br /> annual review and approval by the County and the State, and the amount shall be <br /> adequate to ensure reclamation of disturbed land and/or land to be disturbed during a <br /> given phase. The annual review of the financial guarantee shall be coordinated with the <br /> annual inspection and approval of successive reclamation security so that the guarantee <br /> includes that amount of disturbed land plus the amount of land estimated to be disturbed <br /> during the next 12 months, less that amount of land previously determined by the <br /> Development Services Division's annual inspection to have been reclaimed. The <br /> performance guarantee shall be in the form of either (1) a surety bond, (2) a trust fund <br /> with the lead agency, or (3) an irrevocable letter of credit. Any interest accrued in a trust <br /> fund shall stay with the trust fund account. The financial guarantee shall be payable to <br /> "San Joaquin County or the Department of Conservation" under the applicable <br /> provisions of the County and State mining regulations. The financial guarantee shall be <br /> callable by the County or the State under the following circumstances: <br /> i <br />