r <br /> -- k" KLEINFELDER <br /> by <br /> 4 ACTIVITIES CONDUCTED <br /> I <br /> Two shallow monitoring wells were installed between a proposed settling pond at the subject site <br /> and the Delta Mendota Canal (see Plate 1). Additionally Kleinfelder attempted to conduct <br /> groundwater sampling from three "deep" wells and one domestic well in and around the subject <br /> { site area. Specifically the work was conducted to monitor overdraft, perched water, flow patterns, <br /> and possible changes to water quality beneath the proposed Phase I, IT and. III gravel pits of the <br /> { DSS facility. Kleinfelder's fieldwork is summarized in the following sections. <br /> 4.1. PERMITTING AND PRE-FIELD ACTIVITIES <br /> Kleinfelder submitted a workplan to DSS based on comments by Ray Borges at PHS/EHD and <br /> CDD requirements. Kleinfelder additionally submitted an application for installation of two <br /> monitoring wells. The work was based on Kleinfelder's proposal dated September 27, 2000 was <br /> authorized by DSS on October 2, 2000. The monitoring well application permit was approved by <br /> PHS/EHD on October 6, 2000. The boring location area was marked in white paint and <br /> Underground Service Alert was notified at least 48 hours prior to drilling activities. <br /> Additionally, the proposed boring locations were reviewed by Chad Dessert of DSS. For a copy <br /> of the boring permit,please refer to Appendix E. <br /> 4.2 MONITORING WELL INSTALLATION <br /> Two soil borings (MW-1 and MW-2) were advanced on October 26, 2000 between the "Phase I <br /> Settling Ponds" and the Delta Mendota Canal (Plate 1). The soil borings were advanced using a <br /> truck-mounted drill rig equipped with 8-inch diameter hollow stem auger. Soil samples were <br /> collected at 5 to 10-foot intervals beginning at 5 feet for logging purposes. The borings were <br /> advanced to an approximate depth of 35 feet below ground surface (bgs). No subsurface <br /> groundwater was noted in the two borings. <br /> The borings were drilled and logged according to the protocol described in Appendix B. A two-inch <br /> monitoring well was constructed in each of the two borings, as generally described in Appendix B, <br /> Section B-3.1. The top of casing of monitoring wells MW-1 and MW-2 are approximately 195 feet <br /> above MSL. Monitoring well MW-I was screened from approximately 14 to 34 feet bgs. <br /> Monitoring well MW-2 was screened from approximately 15 to 35 feet bgs. The wells were <br /> screened using Schedule 40 PVC pipe with 0.020-inch factory cut slots. A copy of the boring log <br /> and well construction details are presented in Appendix A. <br /> Soil cuttings generated while drilling were placed on the ground near the borings and left on site. <br /> 20-2245-36.E01/2011 R279 Page 4 of 10 <br /> Copyright 2001,Klcinfelder,Inc. March 14,2001 <br /> i <br /> w <br />