Laserfiche WebLink
n <br /> Monitoring and reporting program NO.99-034 <br /> DSS Company <br /> ` Vemalis Quarry <br /> San Joaquin County <br /> VEHICLE AND EQUIPMENT MAINTANCE <br /> All equipment is inspected daily prior to put it in service (a safety requirement) all defects are <br /> repaired as soon as possible. <br /> STORM WATTER MONITORING <br /> Plant site has a perimeter berm around site. The floor of the entire site has a one-percent slope <br /> directed to the settling pond. Season to date we have had very little rain and the only running <br /> water on the site has been from the plant area and it has gone to the ponds as designed. The <br /> flow into the ponds have been in the 1000 gallons per minute range when it rains heavily with <br /> little to no effect on the pond level. <br /> "1 certify under penalty of law that I have personally examined and am familiar with the information <br /> submitted in this document and all attachments and that, based on my inquiry of those individuals <br /> immediately responsible for obtaining the information, I believe that the information is true, accurate,and <br /> complete. I am aware that there are significant penalties for submitting false information, including the <br /> possibility of fine and or imprisonment" <br /> Billy(Ron)Yoakum <br /> Plant Superintendent <br /> E, <br /> Page 4 <br />