My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004149
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36869
>
2600 - Land Use Program
>
QX-96-0001
>
SU0004149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:00:10 PM
Creation date
9/6/2019 10:44:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004149
FACILITY_NAME
QX-96-0001
STREET_NUMBER
36869
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36869 S KOSTER RD
RECEIVED_DATE
9/22/1996 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36869\QX-96-01_EIR 96-3\SU0004149\PUB REC REL APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
782
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fi <br /> Monitoring and reporting program NO.99-034 <br /> DSS Company <br /> Vernalis Quarry <br />' San Joaquin County <br /> WATER SUPPLY MONITORING <br /> On 11/30/00 KLEINFELDER-Stockton pulled samples from deep well 1 at 11:50 am and turned <br /> them over to Sequoia analytical on 12/01/00 at 11:00 for analyses. <br /> Hardness 180 mg/I <br /> Calcium 40.3 " <br /> Copper ND <br /> Iron 2.83 " <br /> Magnesium 19.3 " <br /> Manganese 0.232 <br /> Potassium 1.96 " <br /> Sodium 52.1 " <br /> Zinc 0.0142 " <br /> Specific Conductivity @25C 606 umhos/cm <br /> pH 8.32 pH Units <br /> VEHICLE AND EQUIPMENT MAINTANCE <br /> All equipment is inspected daily prior to put it in service(a safety requirement) all defects are <br /> repaired as soon as possible. <br /> STORM WATTER MONITORING <br /> Plant site has a perimeter berm around site. The floor of the entire site has a one-percent slope <br /> directed to the settling pond. Season to date we have had very little rain and the only running <br /> water on the site has been from the plant area and it has gone to the ponds as designed. The <br /> flow into the ponds have been in the 1000 gallons per minute range when it rains heavily with <br /> little to no effect on the pond level. <br /> "I certify under penalty of law that I have personally examined and am familiar with the information <br /> submitted in this document and all attachments and that, based on my inquiry of those individuals <br /> immediately responsible for obtaining the information, I believe that the information is true, accurate, and <br /> complete. I am aware that there are significant penalties for submitting false information, including the <br /> possibility of fine and or imprisonment" <br /> Billy (Ron)Yoakum <br /> Plant Superintendent <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.