Laserfiche WebLink
r <br /> ta..� <br /> LIST OF TABLES <br /> + Table PAge <br /> a 2-1 Summary of Impacts and Mitigation Measures . . . . . . . . . . . . . . . . . . . 24 <br /> 3-1 Aggregate Products Production and Sales per Year (in tons) . . . . . . . . 3-7 <br /> 3-2 Quarry Volumes per Phase . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-13 <br /> 3-3 Aggregate Production and Estimated Life . . . . . . . . . . . . . . . . . . . . . . 3-13 <br /> 3-4 Quarry and Processing Plant Area . . 3-14 <br /> 3-5 Water Requirements for Aggregate Processing (Daily) . . . . . . . . . . . . 3-15 <br /> 4.2-1 Major Faults Potentially Affecting the Project Site . . . . . . . . . . . . . . . . . 4-9 <br /> 4.4-1 Traffic Level of Service Definitions At Unsignalized Intersections . . . . 4-40 <br /> 4.4-2 Intersection Levels of Service Existing Conditions -AM Peak Hour . . 4-45 <br /> 4.4-3 Roadway Segment Levels of Service Existing <br /> Conditions - AM Peak Hour . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-46 <br /> 4.4-4 Weaving Impacts Summary Existing Conditions - AM Peak Hour . . . 4-47 <br /> 4.4-5 Intersection Levels of Service Cumulative Conditions -AM Peak Hour4-52 <br /> 4.4-6 Intersection Levels of Service With Project Mitigation Cumulative <br /> J 9 <br /> Conditions -AM Peak Hour . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-53 <br /> 4.4-7 Roadway Segment Levels of Service Cumulative <br /> Conditions - No Vernalis Interchange . . . . . . . . . . . . . . . . . . . . . . . . . 4-55 <br /> 4.4-8 Roadway Segment Levels of Service Cumulative Conditions - With <br /> Vernalis Interchange . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-56 <br /> 4.4-9 Weaving Impacts Summary Cumulative Conditions -AM Peak Hour . 4-57 <br /> r 4.5-1 Ambient Air Quality Standards 4-64 <br /> } 4.5-2 Summary of Annual Air Quality Data . . . . . . . . . . . . . . . . . . . . . . . . . . 4-65 <br /> ' 4.5-3 SJVAB Attainment Status Designations . . . . . . . . . . . . . . . . . . . . . . . 4-67 <br /> 4.5-4 Projected Facility Construction Emissions . . . . . . . . . . . . . . . . . . 4-71 <br /> 4.5-5 Operational Fugitive Dust (PM,o) Emissions From Mining and <br /> Reclamation Activities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-74 <br /> 4.5-6 Regional Operational Mobile Source Emissions From Equipment and <br /> Motor Vehicles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-75 <br /> 4.5-7 Predicted Carbon Monoxide Concentrations . . . . . . . . . . . . . . . . . . . . 4-76 <br /> 4.5-8 Projected Processing Plant Emissions . . . . . . . . . . . . . . . . . . . . . . . . 4-77 <br /> 4.5-9 Predicted Carbon Monoxide Concentrations <br /> (Alternatives 1, 2, and 3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-80 <br /> r- 4.6-1 Ambient Noise Survey Results DSS Quarry Project - San Joaquin <br /> s County March 12, 1997 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-87 <br /> 4.6-2 Processing Area Noise Sources and Predicted Noise Levels <br /> Alternatives 1 and 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-90 <br /> 4.6-3 Processing Area Noise Sources and Predicted Noise <br /> f Levels Alternative 3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-91 <br /> r, 4.6-4 Mining Noise Sources and Predicted Noise Levels <br /> Alternatives 1, 2, and 3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-93 <br /> E 4.6-5 Predicted Peak Hour Traffic Volumes and Noise Levels <br /> ,. Alternative 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-94 <br /> Draft Environmental Impact Report ER-96-3 <br /> I iii <br /> r � <br />