Laserfiche WebLink
i 1 . Does it appear that any environmental feature of the project <br /> will generate significant public concern or controversy? <br /> i . <br /> ( } Yes ( �° ) No Nature of concern(s) : <br /> 2 . Will the project require approval or permits by agencies <br /> other than the County? ( ) Yes { ) No <br /> Agency name(s) <br /> 3 . Is the project within the Sphere of Influence, or within two <br /> miles, of any city? <br /> ( ) Yes { } No City: <br /> ENVIRONMENTAL IMPACTS: <br /> "Yes" may only be checked in situations where there is substantial evidence to <br /> indicate that there may be a significant adverse impact on the environment there <br /> is no change in the project description. (CEQA Guidelines, Sec. 15664) <br /> See the "Discussion" section at the end of the Initial Study for.explanation of any <br /> impacts checked "Yes", or any "No" answer marked with an asterisk S*) . <br /> Sources. The following sources of information have been used in determining <br /> environmental impactse <br /> original source materials and maps on file in the Community Development Department <br /> including: all County and City general plans and community plans; assessor parcel <br /> books; various local and FEMA flood zone maps; service district maps; maps of <br /> geologic instability; maps and reports on endangered species such as the Natural <br /> Diversity Data. sase; noise contour maps; specific roadway plans; maps and/or records <br /> of archeological/historic resources; soil reports and maps; etc. Many of these <br /> original source materials have been collected from other public agencies or from <br /> previously prepared EIR's and other technical studies. <br /> Additional standard sources which should be specifically cited below include on-site <br /> visits by staff (note date); staff knowledge or experience; and independent <br /> environmental studies submitted to the County as part of the project application <br /> (note report title, date, and consultant) . <br /> 1. WATER: <br /> ,a. Is any .portion of the project <br /> subject to flood hazard? <br /> Flood zone: <br /> b. Will the project result in <br /> reduction of surface or ground <br /> water quality or quantity? <br /> c. Will the project result in <br /> increases to surface, channel <br /> or stream volumes, or alterations <br /> to drainage patterns and streams? <br /> d. Will the project result in <br /> erosion of or sedimentation to <br />