Laserfiche WebLink
CONTOURS FROM HAUL TRUCKS <br /> 6 R7 <br /> R4 R®l71�S . <br />` BlewatE Aped <br /> po � <br /> BASE NB <br /> ESTIMATED NOISE FRO <br /> MINING OPERATIONS I <br /> PHAS NORTHEAST CORNE <br /> OF SITE <br /> Ix P 1 <br /> PHASE 11 PHASE VIII <br /> I <br /> PHASE III PHASE Vil j <br /> PAROL A <br /> rt � <br /> Ra <br /> PHASE V PHASE Vi <br /> i <br /> I <br /> i <br /> --- Noise Contours(Leg during combined' <br /> R2 ruining and processing operations and <br /> Al traffic) - 0 Bpp <br /> 0 Residences(Labeled R1-R8) F"I <br /> Feet <br /> RMC Pacific Vernalis Quarry.203015 <br /> SOURCE:Spinardi Aswdates and Tom11 Surveying,Mapping,and <br /> GIs Services,2M3;and ESA.2005 Figure 4.5-3 <br /> Noise Contours for the Portable Temporary <br /> Processing Plant, Mining Operations, and Haul Trucks <br />