Laserfiche WebLink
p U!fy <br /> COUNTY OF SAN JOAQUIN <br /> 2. :L <br /> DEPARTMENT OF PUBLIC WORKS THOMAS R. <br /> DEPUTY DIRECTOR <br /> P- O. BOX 1810- 1810 EAST HAZELTON AVENUE MANUEL LOPEZ <br /> STOCKTON CALIFORNIA 9520?-187(1 DEPUTY ORECTOP <br /> 4C j F�' 209/468-3000 <br /> FAX:209/468 2499 STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> HENRY M. IiiRATA <br /> D+RECTOR <br /> February 4, 1998 <br /> t8 <br /> ME1�10Rr1NDUM <br /> Unmmllnit/ oal�eiccmentl��r <br /> TO: Thomas M. Gau, Senior Civil Engineer <br /> Community Development Department <br /> CONTACT PERSON: Kerry Sullivan <br /> FROM: Tom M. Iwamiya, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT: SA-97-52 A SITE APPROVAL APPLICATION FOR A HOME OCCUPATION <br /> (COMMERCIAL KITCHEN) FOR A PIES AND PASTRIES HOME BAKERY, <br /> LOCATED ON THE EAST SIDE OF LAMMERS ROAD, 1,800 FEET SOUTH OF <br /> VALPfCO ROAD. (DISTRICT 5). <br /> APPLICANT: Kandi Tuso APN: 240-140-14 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood <br /> Hazard Area. <br /> Lammers Road has an existing right-of-way width of 50 feet and a planned right-of-way width of <br /> 84 feet, <br /> RECOMMENDATIONS: <br /> I . Encroachment permit shall be required for work within road right-of-way. <br /> Development Title Section 9-1145.4) <br /> 2. Unless already paved, the driveway approach shall be improved in accordance with the <br /> requirements of San Joaquin County Standards R-17 prior to issuance of the occupancy <br /> permit. <br /> (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee will be required for this development. The fee is due and <br /> payable at the time of building permit application. (The fee currently is $168.90 per daily <br /> trip-end generated in the Tracy area. The fee shall be automatically adjusted July 1 of each <br /> year by the Engineering Construction Cost Index as published by the Engineering News <br /> Record.) <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, R-95-650 and R-96-592) <br /> 4. A copy of the Improvement Plan shall be submitted prior to release of building permit. <br /> T,1v11:RWH:ti <br /> F'Ki8035.13 <br /> E: Manuel Lopez, Deputy Director/Development <br />