Laserfiche WebLink
g. REMOVAL OF FACILITIES: Freestanding structures, antennas, and supporting equipment <br /> associated with wireless telecommunication shall be removed by the provider of such facilities and the <br /> site restored to its pre-construction state if said facilities have not been operational or used for a period <br /> of six(6)consecutive months. Removal and site restoration shall be completed within ninety(90)days <br /> of the end of said six(6) month period. (Development Title Section 9-1065.8) <br /> h. BUILDING CODE REQUIREMENTS: The following California Building Code (CBC) and San <br /> Joaquin County Ordinance requirements will be applicable to the proposed project. The following <br /> conditions shall be addressed prior to submittal of a building permit application to the Building <br /> Inspection Division: <br /> (1) A building permit for each separate structure or building is required. Submit plans, Specifications <br /> and supporting calculations, prepared by a Registered Design Professional(architect or engineer) <br /> for each structure or building, showing compliance with the 2016 Califomia Building, Existing <br /> Building, Mechanical, Plumbing, Electrical, Energy and Fire Codes as may be applicable. Plans <br /> for the different buildings or structures may be combined into a single set of construction <br /> documents. <br /> (2) A grading permit will be required for this project. Submit plans and grading calculations, including <br /> a statement of the estimated quantities of excavation and fill, prepared by a Registered Design <br /> Professional. The grading plan shall show the existing grade and finished grade in contour <br /> intervals of sufficient clarity to indicate the nature and extent of the work and show in detail that it <br /> complies with the requirements of the code. The plans shall show the existing grade on adjoining <br /> properties in sufficient detail to identify how grade changes will conform to the requirements of the <br /> code. <br /> (3) The required plans must be complete at the time of submittal for a building permit. Plans must <br /> address building design and construction,fire and life safety requirements, accessibility and show <br /> compliance with the current California codes and San Joaquin County ordinances.A complete set <br /> of plans must include fire sprinkler plans, truss design submittals, metal building shop drawings, <br /> structural plans and calculations, plumbing,electrical and mechanical drawings and energy report. <br /> (4) A soils report is required pursuant to CBC § 1803 for foundations and CBC appendix§ J104 for <br /> grading. All recommendations of the Soils Report shall be incorporated into the construction <br /> drawings. <br /> (5) For each proposed new building, provide the following information on the plans: <br /> a. Description of proposed use <br /> b. Existing and proposed occupancy Groups <br /> c. Type of construction <br /> d. Sprinklers(Yes or No) <br /> e. Number of stories <br /> f. Building height <br /> g. Allowable floor area <br /> h. Proposed floor area <br /> i. Occupant load based on the CBC <br /> j. Occupant load based on the CPC <br /> i. CALIFORNIA FIRE CODE: The following California Fire Code (CFC) will be applicable to the <br /> proposed project and shall be incorporated into the final construction plans and the construction <br /> phases of the project. The following conditions shall be addressed prior to submittal of a building <br /> permit application to the Building Inspection Division: <br /> (1) The project shall conform to the appropriated edition of the California Fire Code(currently the 2016 <br /> edition)and all related standards. <br /> PA-1800329 (SA) Conditions of Approval 2 <br />