Laserfiche WebLink
�. Page 1 of 2 <br /> 1 <br /> Lisa Medina [EH] <br /> From: Majors Engineering [majorsengineering@gmaii.com] <br /> Sent: Tuesday, May 27, 2008 1:20 PM <br /> To: Lisa Medina [EH] <br /> Cc: John Raney; Bruce Towne <br /> Subject: Meeting Time <br /> Lisa, <br /> I talked to John Raney and gave him the detailed information you still need for the soils suitability <br /> report which is the following: <br /> 1. Clarify seepage collection on Introduction 1.0 of report-the last sentence of paragraph <br /> 2: Need copy of letter dated February 29, 2008 referenced on section 2.0 of report-last sentence of <br /> paragraph <br /> 3. Need to include Precise dimensions on Plot Plan-Plate 2 of report <br /> Percolation Testing sheets for all eight parcels to be certified-signed by engineer or qualified <br /> didate and faxed to Lisa <br /> On page 3 section 4.0- include in the body of the paragraph if any ground water contamination was <br /> present or not <br /> b\. On Parcel 6 & 7 of the percolation testing-elaborate on slow perc rates for these parcels/test holes <br /> 7\ In conclusion of report-mention that parcels 2,3,4,5 & 8 failed and that reperc testing S required or. <br /> r engineered designed sewage disposable systems would be required at time of building <br /> � �'` <br /> ZY( �\ Also, a condition on a letter dated November 2006? in which the domestic well of homehave the the sanitary seal installed and a raised elevation of 12 inches is required is to be included with theme='�,, <br /> current conditions of approval from EHD. I am to receive this letter from Lisa by fax per Lisa Medina. <br /> Please ensure that the above list is correct and details what you told me in our phone conversation today, <br /> we want to also set up a meeting to include yourself, John Raney, Mike Majors, and Bruce Towne so <br /> that we can coordinate this and ensure we are all on the same page as far as getting these requirements <br /> met so that we can move forward and get our signature for the Conditions of Approval. We are <br /> anxiously waiting for the completion of these requirements so that we can move forward with the next <br /> steps of this project. I cannot emphasize enough how important it is to finish this part of the <br /> requirements is to the developer/owner. <br /> Please contact me or respond to this email so that we can coordinate this meeting. <br /> Thank You, <br /> Susana <br /> Majors Engineering <br /> P.O Box 274 <br /> Clarksburg, CA 95612 <br /> (916) 776-1888 Office <br /> (916)416-6334 Mobile <br /> 5/27/2008 <br />