Laserfiche WebLink
5 <br /> ! 6 <br /> oPqu]N C <br /> )... 'A� <br /> P.D.BOX 1814-1810 E.HAZELTDN AVENUE <br /> ` a THOMAS R. FLINN STOCKTON,CALIFORNIA 95201-3018 <br /> DIRECTOR (209)468-3000 FAX(209)468 2999 <br /> www,sjgov.org <br /> L�FU� <br /> THOMAS M.GAU <br /> DEPUTY DIRECTOR � - - <br /> IO w�klti> for <br /> YOU <br /> MANUEL SOLOR <br /> DEPUTY bIRECTOR <br /> STEVEN WINKLER <br /> .DEPUTY DIRECTOR <br /> ROGERVANES <br /> BUSINESS ADMINISTRATOR <br /> June 15, 2006 <br /> MEMORANDUM <br /> TO: Raymond Hoo, Senior Planner <br /> Community Development Department <br /> CONTACT PERSON: Karla Kuhl <br /> FROM: Dean Gilman,Engineer TV <br /> Public Services Division <br /> SUBJECT: PA-06-114 A MINOR SUBDMSION APPLICATION TO SUBDIVIDE TWO PARCELS <br /> TOTALING 326 ACRES INTO EIGHT PARCELS.EACH PARCEL TO CONTAIN 40 ACRES <br /> OR MORE,LOCATED ON THE NORTH SIDE OF LAUFFER ROAD,APPROXIMATELY, <br /> 1,400 FEET WEST OF VAIL ROAD. (SUPERVISORIAL DISTRICT 4) <br /> PROPERTY OWNER: Bruce P. &Hellen H. Towne, Trust APPLICANT: Michael J.Majors <br /> ADDRESS: 13045 W.Lauffer Road APN: 001-030-03 <br /> INFORMATION: <br /> The site is currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> The 100-year Flood Elevation will be approximately 15 feet NGVD. <br /> A 10-foot building set back is required from the toe of the Mokelumme River levee. <br /> Lauffer Road has an existing right-of-way width of 40-feet and a planned right-of-way width of 50-feet. <br /> The Traffic Impact Mitigation Fee shall be required when parcels are developed. The fee is due and payable at <br /> the time of building permit application. <br /> The Regional Traffic Impact Fee will be required when parcels are developed.The fee is due and payable at the <br /> time of building permit application. <br /> RECOMMENDATIONS: <br /> 1. The Parcel Map requirement is waived. A Certificate of Compliance is required. A fee of$600 is required <br /> for the processing of the legal descriptions. The fee due will be based on the current fee schedule. <br /> (Development Title Section 9-890.4) <br />