Laserfiche WebLink
1-4. Single Phase Developr <br /> Start of Construction (Monthl'Year):A-m�t — IDIJ I-P" Gross Acres:26 <br /> End of Construction(MonthNear): February 2021 Net Acres(area devoted to b0dings/structures),3.9 <br /> First Date of Occupation(month/Year)-, February 2021 Paved Parking Area(4-of Spaces):t" <br /> Building Square Footage: 159,200 sf Number of Dwelling Units:0 <br /> J. On-Site Air Pollution Reductions (Mitigation Measures) <br /> Listed below are cate-garies of possible mitigation measures that will reduce a project's impact on air quality, If a category is <br /> ntif�specific ming-vion measures within <br /> applicable to the project,check"Yes",and please complete the corresponding page to ide <br /> that category. If a categoty is not applicable to the project,check"No". <br /> I.. Construction Clean Fleet(making a com mitment to using a construction fleet that will achieve the emission reduc',ions required by <br /> District Rule 95 10) <br /> Yes,please complete mitigation measitre I <br /> N o <br /> 2. Land UsoLocation (e.g.increased density.improve walkability desim increase transit.etc.) <br /> Fj Yes,please complete applicable mitigation measures 2a through�f <br /> Z No <br /> 3. Neigbborhood/Site Enhancements(e.g, improve pedestrial network,traffic calming measures,NrEV nemork,eTc.) <br /> F-1 Yes,please complete applicable miirigation measures 3a through 3c <br /> 19 No <br /> 4. Park,ing Policy/Priciiigo(e.- parking cost.on-street market pricinar limit parking supplY.etc.) <br /> F-I ye& please complete applicable mitigation measure 4a through 4e <br /> [�9 N o <br /> Commute Trip Reduction Programs(e.g.workplace parking charge,employee vanpooVshuttle,ride sharing program.e�tc.) <br /> F1 Yes.please complete applicable mitigation meamres 5a through 5f <br /> Z No <br /> 6. Building-Desige;n(e.- woodstovesorftreplaces) <br /> Yes,please complete mitigation measure 6 <br /> No <br /> 7. Building Energy(e_&exceed title 24, electrical maintenance equipment) <br /> Yes,please complete applicable mitigation measures 7a through 7b <br /> No <br /> 8.Solar Panels(e.g. incorporate solar panels in the project) <br /> [-I Yes,please complete applicable miligation meamre 8 <br /> E No <br /> 9. Electric Vehicle(EV)Charger(e.g.incorporate EV charger(s)in the project) <br /> Yes,please complete applicable mizigwion meauffe 9 <br /> No <br /> K. Review Period <br /> You may request a five(5)day periW to review a draft of the District's analysis of yow project befbre it is finalized. However.if you <br /> choose this option.it will delay the project's fmalization by five(5)business days. <br /> 1 request to review a draft of the District's analysis. <br /> Central Region Office: 1990 E.Gettysburg Ave.Fresno,CA93725-Q244 TEL(559)230-6000 FAX(559)230-6061 7 <br /> Page 3 of 12 ResKknttaVNon-ResidentiaUMDced-Use Application Form Revised June 28.2019 <br />