Laserfiche WebLink
county inspector. This inspections reviews the specific location of the tanks and at grade bed and <br /> covers any specific constructions issues (i.e. drainrock sources, capping fill borrow areas, etc.). <br /> The second inspection is conducted after the soil has been ripped under the distribution bed. All <br /> materials are reviewed at this time including the tanks, sand and drainrock. A pressure distribution <br /> inspection is made when the gravel has been placed and the plumbing completed. Water is <br /> required to be in the tanks and a generator may be required. A final inspection is conducted when <br /> all aspects of the system have been completed including capping fill and the control panel. At that <br /> time, a final letter may be sent to the county verifying that the system has been completed to our <br /> satisfaction and the system may be operated. <br /> Enclosed, please find revised plans for the two systems. Revisions have been made per our <br /> meeting last week. Should you have questions or comments regarding this information, do not <br /> hesitate to contact me. <br /> Res ctfully Submitted, <br /> Step uckley, <br />