Laserfiche WebLink
' f• <br /> \/ <br /> Chandler Martin -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-05-554(SA) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. (The fee currently is $1, 304.00 per 1,000 gross square foot of building <br /> designated as Service Commercial in the Lockeford area. The fee shall be automatically adjusted July 1 of <br /> each year by the Engineering Construction Cost Index as published by the Engineering News Record.) <br /> (Resolutions 00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> Note: Any construction activity that results in the disturbance of at least one(1)acre of soil shall require a State <br /> NPDES construction permit. <br /> MRC:SH:ar <br /> P1CON04RK VSAM ZOOSPA-WW554.,Td <br />