Laserfiche WebLink
y <br /> Y <br /> Chandler Martin -2- <br /> �COMMUNIT'Y DEVELOPMENT <br /> PA-05-563 (SA) <br /> 2. The driveway approach shall be improved in accordance with the requirements of San Joaquin County <br /> Standards R-17 prior to issuance of the occupancy permit. (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. (The fee currently is $193.16 per additional daily trip-end generated in <br /> the Lodi area. The fee shall be automatically adjusted July 1 of each year by the Engineering Construction <br /> Cost Index as published by the Engineering News Record.) (Resolutions 00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Any structures built within the 100-year flood zone must have a finished floor elevation established by San <br /> Joaquin County Stormwater Management Division and meet all FEMA, State, and County requirements. <br /> Note: Any construction activity that results in the disturbance of at least one(1)acre of soil shall require a <br /> State NPDES construction permit. <br /> MRC:DG:ar <br /> P:`LtlMMBNTbl4A\Y 20 TA-0 W563 Pm-eppli wa wpd <br />