Laserfiche WebLink
PROJECT DESCRIPTION <br /> Description of the proposed project: <br /> 0 - 18 mos.: Construct a 21,000 s.f. warehouse (Structure 12) for short-term storage of <br /> bagged dry mix products, a 2,120 s.f. cover (Structure 20) over an existing drive-over <br /> hopper system used in the manufacturing of brick pavers, and a 2,820 s.f. building <br /> (Structure 22) for the storage of pallets used in the manufacturing of brick pavers. <br /> 18 mos. - 5 years: Construct a 1,200 s.f. cover (Structure 13) over an area presently used <br /> for exterior storage of dry mix products, a 1,692 s.f. cover (Structure 14) over an existing <br /> drive-over hopper system used in the manufacturing of dry mix products, a 4,080 s.f. cover <br /> (Structure 15) over an area presently used for the short-term storage of concrete block <br /> products, a 1,200 s.f. cover (Structure 16) over existing equipment used in the <br /> manufacturing of concrete block products, a 1,900 s.f. cover (Structure 17) over an existing <br /> hopper system used for the manufacturing of concrete block products, a 960 s.f. lunch <br /> room (Structure 18) used by the manufacturing personnel, a 1,170 s.f. cover (Structure 19) <br /> over an existing hopper system used in the manufacturing of brick pavers, a 5,481 s.f. <br /> cover (Structure 21) over an area presently used in the storage of brick pavers, a 600 s.f. <br /> building (Structure 23) used for the repair of wooden pallets used in shipping product, and <br /> a 400 s.f. building (Structure 24) housing a bagged rock machine. <br /> The buildings covering the hoppers will help in the dust control efforts at the plant. <br /> BUILDINGS AND STRUCTURES <br /> Structure Ground Highest Overall <br /> Number Proposed Use Floor Area Floor Height <br /> 12 Proposed Dry Mix Storage Building 21,000 1 23.5' <br /> 13 Proposed Covered Exterior Dry Mix Storage 1,200 1 22' <br /> 14 Proposed Cover Over Existing Hoppers 1,692 NA 33' <br /> 15 Proposed Covered Exterior Block Storage 4,080 1 23' <br /> 16 Proposed Cover Over Existing Equipment 1,200 1 25' <br /> 17 Proposed Cover Over Existing Hoppers 1,900 1 25' <br /> 18 Proposed Lunch Room 960 1 14' <br /> 19 Proposed Cover Over Existing Aggregate Bins 1,170 1 23' <br /> 20 Proposed Cover Over Existing Hoppers 2,120 1 33' <br /> 21 Proposed Covered Paver Storage 5,481 1 25' <br /> 22 Proposed Paver Manufacturing Pallet Storage 2,820 1 25' <br /> 23 Proposed Pallet Repair Building 600 1 26' <br /> 24 Proposed Bagged Rock Manufacturing Building 400 1 26' <br />