Laserfiche WebLink
Chandler Martin -2- <br /> COMMENTS ON DEVELOPMENT <br /> PA-05-79 (UP) <br /> 3. The Traffic Impact Mitigation Fee may be required for this development. The fee is due and payable at the <br /> time of building permit application. (The fee currently is$ 799.00 per 1000 gross square foot of building <br /> designated as Manufacturing in the Tracy area. The fee shall be automatically adjusted July 1 of each year <br /> by the Engineering Construction Cost Index as published by the Engineering News Record. <br /> (Resolutions R-00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division (468-3066)that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon submittal <br /> of verification. <br /> Note: Any construction activity that results in the disturbance of at least one(1) acre of soil shall require a State <br /> NPDES construction permit. <br /> MRC:DG:ar <br /> P1COMM1ff.NfSM"20 A-0500029.wpd <br />