My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005703
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LIVE OAK
>
10201
>
2600 - Land Use Program
>
PA-0500686
>
SU0005703
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:31:42 AM
Creation date
9/6/2019 10:58:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0005703
PE
2626
FACILITY_NAME
PA-0500686
STREET_NUMBER
10201
Direction
E
STREET_NAME
LIVE OAK
STREET_TYPE
RD
City
STOCKTON
APN
06310019
ENTERED_DATE
10/17/2005 12:00:00 AM
SITE_LOCATION
10201 E LIVE OAK RD
RECEIVED_DATE
10/12/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LIVE OAK\10201\PA-0500686\SU0005703\APPL.PDF \MIGRATIONS\L\LIVE OAK\10201\PA-0500686\SU0005703\CDD OK.PDF \MIGRATIONS\L\LIVE OAK\10201\PA-0500686\SU0005703\EH COND.PDF \MIGRATIONS\L\LIVE OAK\10201\PA-0500686\SU0005703\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i, <br /> Ms.Allen (C October 27, 2005 ' <br /> PA 0500686(UP) Page 4 <br /> Construction activity mitigation measures include: <br /> — Install sandbags or other erosion control measures to prevent silt runoff to public roadways from <br /> sites with a slope greater than one percent. <br /> - Limit area subject to excavation, grading;and other construction activity at any one time- <br /> - Limit the.hours of operation of heavy-duty equipment acrd/or the amount of equipment in use. <br /> — Replace fossil-fueled equipment with electrically driven equivalents (provided they are not run via <br /> a portable generator set). <br /> — Curtail construction during periods of high ambient pollutant concentrations; this may include <br /> ceasing of construction activity during the peak-hour of vehicular traffic on adjacent roadways, and <br /> "Spare the Air Days," declared by the District. <br /> — Implement activity management(e.g. rescheduling activities to reduce short-terra impacts). <br /> — During the smog season (May through October), lengthen the construction period to minimize the <br /> number of vehicles and equipment operating at the same time. <br /> — Off road trucks should be equipped with on-road engines when possible. <br /> — Minimize obstruction of traffic on adjacent roadways. <br /> District. staff is available to meet with you and/or the applicant to further discuss the regulatory <br /> requirements that are associated with this project. If you have any questions or require further <br /> information, please call me at (559) 230-5800 or Mr. Hector R. Guerra,Senior Air Quality Planner, at(559) <br /> 230-5820 and provide the reference number at the top of this letter. <br /> Sincerely, <br /> eorgia A Stewart <br /> Air Quality Specialist <br /> Central Region <br /> C:File <br />
The URL can be used to link to this page
Your browser does not support the video tag.