Laserfiche WebLink
i <br /> Ms.Allen October 27, 2005 <br /> PA 0500686(UP) Page 4 <br /> Construction activity mitigation measures include: <br /> Install sandbags or other erosion control measures to prevent silt runoff to public roadways from <br /> sites with a slope greater than one percent. <br /> Limit area subject to excavation, grading, and other construction activity at any one time. <br /> - Limit the hours of operation of heavy-duty equipment and/or the amount of equipment in use. <br /> Replace fossil-fueled equipment with electrically driven equivalents (provided they are not run via <br /> a portable generator set). <br /> Curtail construction during periods of high ambient pollutant concentrations; this may include <br /> ceasing of construction activity during the peak-hour of vehicular traffic on adjacent roadways, and <br /> "Spare the Air Days,"declared by the District. <br /> Implement activity management(e.g. rescheduling activities to reduce short-term impacts). <br /> During the smog season (May through October), lengthen the construction period to minimize the <br /> number of vehicles and equipment operating at the same time. <br /> Off road trucks should be equipped with on-road engines when possible. <br /> Minimize obstruction of traffic on adjacent roadways. <br /> District staff is available to meet with you and/or the applicant to further discuss the regulatory <br /> requirements that are associated with this project. If you have any questions or require further <br /> information, please call me at (559) 230-5800 or Mr. Hector R. Guerra, Senior Air Quality Planner, at(559) <br /> 230-5820 and provide the reference number at the top of this letter. <br /> Sincerely, <br /> eorgia A Stewart <br /> Air Quality Specialist <br /> Central Region <br /> C: File <br />