Laserfiche WebLink
ADDITIONAL INFORMATION R&,JIREMENTS 2 <br /> LOCKEFORD WINERY <br /> LOCKEFORD,SAN JOAQUIN COUNTY <br /> 12) Allowing for two feet of freeboard, what is the approximate storage capacity of the wastewater <br /> pond? Provide a water balance which evaluates the containment structures ability to provide <br /> sufficient capacity on a month by month basis. Include monthly evaporation, precipitation, <br /> and irrigation rates as well as monthly discharge volumes. Rainfall shall be based on the <br /> 100-year return period total annual precipitation. <br /> 13) Describe management provisions that will be implemented to prevent the occurrence of flies, <br /> mosquitoes, and odor nuisances and problems such as pond overflows (maintenance plans, . <br /> standby pumps or generators, and contingency plans, etc.). <br /> 14) Describe the storage and disposal of all solid wastes generated in the winemaking process. <br /> Include a description of operation and maintenance procedures that prevent odor complaints, <br /> fly breeding, or other nuisance condition. <br /> 15) If land disposal of wastewater is contemplated, present loading rates for BOD (in <br /> lbs/acre/day), total nitrogen(in lbs/acre/year), and salts (in lbs/acre/year). Provide a <br /> description of the disposal area and the disposal technique. State the number of acres of land <br /> used for disposal and crops planned for application areas (show locations of land on map). <br /> Describe harvesting and crop disposal procedures. Describe the mixing ratio of wastewater <br /> and supplemental irrigation water prior to application, and describe the tailwater control and <br /> return system. <br /> 16) Provide information sufficient to determine whether this discharge of wastewater will <br /> adversely impact underlying groundwater. <br /> 17) Before the Board can adopt WDRs for this discharge, the requirements of the California <br /> Environmental Quality Act (CEQA) must be complied with. Will the County adopt a CEQA <br /> document for this facility? If yes, give an anticipated date of adoption. If no, the Discharger <br /> will be responsible for hiring a consultant to complete all the CEQA documents. If this is the <br /> case, the name of the consultant and the anticipated schedule for document completion shall <br /> be submitted with the Report of Waste Discharge. <br />