My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002199
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOCKE
>
12686
>
2600 - Land Use Program
>
UP-00-05
>
SU0002199
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:06 AM
Creation date
9/6/2019 10:59:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002199
PE
2626
FACILITY_NAME
UP-00-05
STREET_NUMBER
12686
Direction
E
STREET_NAME
LOCKE
STREET_TYPE
RD
City
LOCKEFORD
APN
05132002,03
ENTERED_DATE
10/23/2001 12:00:00 AM
SITE_LOCATION
12686 E LOCKE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LOCKE\12686\UP-00-05\SU0002199\APPL.PDF \MIGRATIONS\L\LOCKE\12686\UP-00-05\SU0002199\CDD OK.PDF \MIGRATIONS\L\LOCKE\12686\UP-00-05\SU0002199\EH COND.PDF \MIGRATIONS\L\LOCKE\12686\UP-00-05\SU0002199\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring Well Installation Workplan - 2 - <br /> Monitoring <br /> 2 -Monitoring Well Installation Report <br /> F. Soil Sampling(if applicable): <br /> Cuttings disposal method <br /> Analyses to be run and methods <br /> Sample collection and preservation method <br /> Intervals at which soil samples are to be collected <br /> Number of soil samples to be analyzed and rationale <br /> Location of soil samples and rationale <br /> QA/QC procedures <br /> G. Well Sampling: <br /> Minimum time after development before sampling(48 hours) <br /> Well purging method and amount of purge water <br /> Sample collection and preservation method <br /> QA/QC procedures <br /> H. Water Level Measurement: <br /> The elevation reference point at each monitoring well shall be within 0.01 foot. Ground <br /> surface elevation at each monitoring well shall be within 0.1 foot. Method and time of water <br /> level measurement shall be specified. <br /> I. Proposed time schedule for work. <br /> Monitoring Well Installation Report of Results <br /> A. Well Construction: <br /> Number and depth of wells drilled <br /> Date(s) wells drilled <br /> Description of drilling and construction <br /> Approximate locations relative to facility site(s) <br /> A well construction diagram for each well must be included in the report, and should contain <br /> the following details: <br /> Total depth drilled <br /> Depth of open hole (same as total depth drilled if no caving occurs) <br /> Footage of hole collapsed <br /> Length of slotted casing installed <br /> Depth of bottom of casing <br /> Depth to top of sand pack <br /> Thickness of sand pack <br /> Depth to top of bentonite seal <br /> Thickness of bentonite seal <br /> Thickness of concrete grout <br /> Boring diameter <br /> Casing diameter <br /> Casing material <br />
The URL can be used to link to this page
Your browser does not support the video tag.