Laserfiche WebLink
>4 s THOMAS R. FLINN P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> _/.`�., STOCKTON,CALIFORNIA 95201 <br /> 6`.� '`• DIRECTOR a ,4 rte' (209)468-3000 FAX (209)468-2999 <br /> *liiBPY• t www.sjgov.org/pubworks <br /> THOMAS M.GAU <br /> CHIEF DEPUTY DIRECTOR e - <br /> MANUEL SOLORIO Working for YOU <br /> DEPUTY DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR R E C Fj VEp <br /> ROGERJANES <br /> BUSINESS ADMINISTRATOR <br /> AY 4 2007 <br /> May 4, 2007 COMMU04Y DgveaOPnWt Dept. <br /> MEMORANDUM <br /> TO: Raymond Hoo, Senior Planner <br /> Community Development Department <br /> CONTACT PERSON: Corinne King <br /> FROM: Dean Gilman, Engineer 1V <br /> Public Services Division )Q�^ <br /> (/ <br /> SUBJECT: PA-07-064 A MINOR SUBDIVISION APPLICATION TO SUBDIVIDE TWO PARCELS <br /> TOTALING 406.12 ACRES INTO THREE PARCELS. PARCEL ONE TO CONTAIN 47.38 <br /> ACRES. PARCEL TWO TO CONTAIN 47.38 ACRES. PARCEL THREE TO CONTAIN <br /> 311.36 ACRES, LOCATED ON THE SOUTHWEST CORNER OF LONE TREE ROAD AND <br /> VAN ALLEN ROAD. (SUPERVISORIAL DISTRICT 4) <br /> PROPERTY OWNER: John &Henrietta Vander APPLICANT: Mid-Valley Engineering, Inc. <br /> Schaaf Tr. <br /> ADDRESS: 19992 E.Lone Tree Road APN: 205-100-16 & 17 <br /> INFORMATION: <br /> A portion of the site is currently located within a Federal Flood Insurance Administration Designated Flood <br /> Hazard Area. The 100-year Flood Elevation will be approximately 1-foot above natural ground. <br /> Lone Tree Road has an existing right-of-way width of 50-feet and a planned right-of-way width of 50-feet. <br /> Van Allen Road has an existing right-of-way width of 45-feet and a planned right-of-way width of 50-feet. <br /> Zumwalt Road has an existing right-of-way width of 40-feet and a planned right-of-way width of 50-feet. <br /> Carrolton Road has an existing right-of-way width of 45-feet and a planned right-of-way width of 50-feet. <br /> The Traffic Impact Mitigation Fee shall be required when parcels are developed. The fee is due and payable at <br /> the time of building permit application. <br /> The Regional Traffic Impact Fee will be required when parcels are developed.The fee is due and payable at the <br /> time of building permit application. <br /> The Water Supply Facilities Impact Mitigation Fee shall be required when parcels are developed. The fee is due <br /> and payable at the time of building permit application. <br />