Laserfiche WebLink
Chandler Martin -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-05-361 (SA) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. (The fee currently is$720.00 per 1,000 gross square foot of building <br /> designated as Manufacturing in the Escalon area. The fee shall be automatically adjusted July 1 of each <br /> year by the Engineering Construction Cost Index as published by the Engineering News Record.) <br /> (Resolutions 00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division(468-3066)that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> 6. A portion of this area is located within the Federal Emergency Management Agency(FEMA)designated <br /> flood hazard area(100-year floodplain). Therefore, all new structures and substantial improvements <br /> constructed within the 100-year floodplain shall be elevated a minimum of three(3)feet above the highest <br /> grade adjacent to the structure. <br /> Note: Any construction activity that results in the disturbance of at least one(1)acre of soil shall require a State <br /> NPDES construction permit. <br /> MRC:SH:ar <br /> PXOFII.ffiM31M R200"A-050MI.,,W <br />