Laserfiche WebLink
PERCOLATION TEST DATA PAGE 7 <br /> PROJECT: Fred A. Paulus Project <br /> Date & Time of Initial Filling Date of test: 5-13-91 <br /> of Water: 5-12-91 8 am <br /> Hole # : 3 Depth: 25 ' <br /> Time: H * D T R <br /> 10 : 00am 10 ' 0 " - - - <br /> 10 : 10 10 ' 9-1/2 9-1/2" 10 1 . 1 <br /> 10 : 20 10 ' 8-1/4 8-1/4 " 10 1 . 2 <br /> 10 : 30 10 ' 10 " 10" 10 1 <br /> 10 : 40 10 ' 6-3/4 6-3/4 " 10 1 . 5 <br /> 10 : 50 10 ' 7-1/2 7-1/2" 10 1 . 3 <br /> 11 : OOam 10 ' 11 " 11" 10 . 9 <br /> Percolation Rate : . 9 min per inch <br /> H = Distance from reference mark to water level . (inches ) <br /> D = Drop in water level between observations . (inches ) <br /> T = Time interval between observations . (minutes ) <br /> R = Rate of percolation (R = T/D) (minutes per inch) <br /> SOIL PROFILE <br /> HOLE # 3 <br /> 0 ' - 4 ' = Silty Clayey 22 ' -25 ' = Sandy <br /> 4 ' -101 = Clayey Silty Sandy <br /> 10 ' -13 ' = Silty Clayey Sandy <br /> 13 ' -22 ' = Silty Sandy <br /> REMARKS <br /> * Maintained refills at 10 feet. <br /> TECHNICIAN: G.J . Tucker of AIM TESTING LABORATORY <br />