Laserfiche WebLink
J <br /> COUNTY OF SAN JOAQUIN THOMAS R.FLINN <br /> c Z� DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> V: [ <br /> P.O.BOX 1810- 1810 EAST HAZELTON AVENUE MANUEL LOPEZ <br /> ECTOR <br /> - STOCKTON,CALIFORNIA 95201-1810 DEPUTY DIRECTOR <br /> • C4� FORN`P • 209/468-3000 STEVEN WINKLER <br /> FAX:209/468-2999 DEPUTY DIRECTOR <br /> HENRY M. HIRATA <br /> DIRECTOR <br /> August 24, 1999 <br /> MEMORANDUM AUG 241999 <br /> TO: Thomas M. Gau, Senior Civil Engineer Community Development De <br /> Community Development Department P pt. <br /> CONTACT PERSON: Kai Luoma <br /> FROM: Gabriel Karam, Senior Civil Engineer GtT <br /> Public Services Division <br /> SUBJECT: SA-99-62 A SITE APPROVAL APPLICATION FOR FARM EQUIPMENT <br /> REPAIR WITHIN EXISTING 7,500-SQUARE-FOOT AGRICULTURAL <br /> STORAGE BUILDING, LOCATED ON THE SOUTH SIDE OF <br /> LONE TREE ROAD, 2,400 FEET EAST OF ESCALON-BELLOTA ROAD. <br /> (DISTRICT 5). <br /> APPLICANT: Fernando and Manal Goncalves APN: 229-080-60 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated <br /> Flood Hazard Area. <br /> Lone Tree Road has an existing right-of-way width of 62 feet and a planned right-of-way width <br /> of 60 feet. <br /> RECOMMENDATIONS: <br /> 1. Encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. The driveway approach shall be improved in accordance with the requirements of <br /> San Joaquin County Standards R-17 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $582.00 per <br /> 1,000 gross square foot of building as manufacturing in the Escalon area. The fee shall <br /> be automatically adjusted July 1 of each year by the Engineering Construction Cost Index <br /> as published by the Engineering News Record.) <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, R-95-650 and R-96-592) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> GK:RWH:gn <br /> PS-9H158 Gi B <br /> E: Manuel Lopez, Deputy Director/Development <br />