Laserfiche WebLink
} <br /> M <br /> Rick Griffin <br /> COMMUNITY DEVELOPMENT <br /> PA-1100021 (SA) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. The fee shall be automatically adjusted July l of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record. (Resolution R-00-433) <br /> 4. The Regional Transportation Impact Fee shall be required for this development. The fee is due and payable at <br /> the time of building permit application. The fee will be based on the current schedule at the time of payment. <br /> (Resolution R-06-3$) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. The developer shall meet the requirements of San Joaquin County Development Standards to prevent the <br /> increased runoff release rate of storm water from discharging onto other properties and to prevent offsite <br /> sediment transport. The existing on-site drainage pattern shall be shown on the Final Site Plan and be <br /> submitted prior to release of building permit. (Development Title Section 9-1135) <br /> ' r <br /> Informational Notes: `. <br /> (i.) The proposed development shall not contribute to storm water pollution. <br /> (ii.) All future building permits for projects located within a Special Flood Hazard Area at the time of permit <br /> issuance shall meet the San Joaquin County flood hazard reduction requirements(Title 9, Chapter 9-1605) <br /> and all requirements of the State of California(CCR Title 23)that are in force at the time of permit issuance. <br /> As an example,these requirements may include raising the finish floor.elevation one foot above the expected <br /> flood level and/or using flood resistant materials. <br /> AC:ds <br /> IISjpwgov.arglshareslDevServiceslDPubServICOMMENTS1SAlYR 10111PA-1100021(Farm Equipment Services-Lone Tree Rd)lPA-1100021.doc <br />