Laserfiche WebLink
Ms. Karla Kuhl <br /> October 26, 2005 <br /> Page Four <br /> 8. If an existing District facility is not centered on the property boundary between two properties, the District <br /> may require an easement width based on the distance to the centerline of the District facility. <br /> In addition to the aforementioned conditions of approval, OID requests a thirty (30) foot wide easement for the <br /> existing Miller Drain along the east property line of the project site. <br /> If OID can be of any further assistance, please do not hesitate to call me at (209) 847-0341, extension 237. <br /> Sincerely, <br /> O IG ON RICT <br /> 7 <br /> John 8. Davids <br /> Assistant, Engineer and <br /> Support Services Manager <br /> Enclosures: OID Project Site Map <br /> OID Subdivision Parcel Map Policy <br /> cc: Administration Files <br /> Kathy Cook, Chief Financial Office <br /> K:\EngineeringVoe Fos\CEQA\SanJoaquinCounty\207-029-012Frost_dM <br />