pavement. Construction of the proposed project will include relocating a portion <br /> of this existing line approximately 22 feet north toward the centerline of Northrup <br /> Street. Building B will be served by connection to an existing 6" service in Longe <br /> Street that is currently stubbed to the project site. Buildings D, E, F and the <br /> remainder of Building C will be served by connection to an existing 10" stub at <br /> the intersection of Longe Street and proposed Lockheed Street. The 10" line will <br /> be extended to follow the alignment of Lockheed Street through the project with <br /> individual services to each building. Building G will be served by connection to an <br /> existing 8" service in CE Dixon Street that is currently stubbed to the project site. <br /> All sewer lines utilized to service the proposed project ultimately flow to a City of <br /> Stockton sewer main in Airport Way. <br /> Storm Drain <br /> Storm water runoff from Buildings A, B, C, D, E, and F will be conveyed via <br /> gravity lines to an existing 54" stub at the intersection of Longe Street and <br /> proposed Lockheed Street. The existing pipe will generally be extended to follow <br /> the alignment of Lockheed Street through the project will branch runs, as <br /> necessary, to serve buildings and associated parking areas. Runoff from Building <br /> G will be conveyed via gravity lines to an existing 15" pipe in CE Dixon Street <br /> that flows to a 48" main, which extends from the airport runways. The existing 15" <br /> pipe will be increased to 24" to accommodate flows from the proposed project. <br /> An alternative for Building G would include installation of pipe from the southwest <br /> corner of the proposed project south to the existing 48" main. This alternative <br /> would require coordination with adjacent leaseholders. All storm drain lines <br /> utilized to service the proposed project ultimately flow to a pump station located <br /> at Airport Way with discharge to a drainage canal that flows south parallel to <br /> Airport Way. The pump station and canal are maintained by San Joaquin County. <br /> Water <br /> Water for the proposed project will be served by the City of Stockton. An <br /> extensive network of water pipes currently exists within the proposed project <br /> limits. However, a majority of the lines are abandoned or inactive. Thus, <br /> construction of the proposed project will include removing and/or abandoning all <br /> existing water lines within the project limits. Active water mains at the project <br /> perimeter include a 10" main in Longe Street (with a 12" stub to the proposed <br /> project), a 12" main in RA Bridgeford Street (with a 6" crossing to the proposed <br /> project), a 6" main in Northrup Street and an 8" main in Lockheed Court. A 12" <br /> water main will be installed in Lockheed Street from the existing 12" stub at <br /> Longe Street to the existing 6" crossing at RA Bridgeford Street. An additional <br /> 12" main will be installed through the project site from Lockheed Street to the <br /> existing 8" line in Lockheed Court. Domestic, fire and landscape services for the <br /> proposed buildings will connect to the proposed 12" main and will be looped <br /> within the project limits as necessary. <br /> Statement of Conformity—Airmetro Business Park Page 3 of 4 <br />