My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002182
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
10702
>
2600 - Land Use Program
>
UP-00-21
>
SU0002182
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:04 AM
Creation date
9/6/2019 11:07:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002182
PE
2626
FACILITY_NAME
UP-00-21
STREET_NUMBER
10702
Direction
N
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
STOCKTON
APN
08405004
ENTERED_DATE
10/23/2001 12:00:00 AM
SITE_LOCATION
10702 N LOWER SACRAMENTO RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LOWER SACRAMENTO\10702\UP-00-21\SU0002182\APPL.PDF \MIGRATIONS\L\LOWER SACRAMENTO\10702\UP-00-21\SU0002182\CDD OK.PDF \MIGRATIONS\L\LOWER SACRAMENTO\10702\UP-00-21\SU0002182\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kerry Sullivan -2- <br /> COMMENTS ON DEVELOPMENTS <br /> UP-00-21 <br /> 3. The owner shall execute an Irrevocable Offer and Agreement to Dedicate Road to result in a <br /> fifty-six (56) foot wide right-of-way from the centerline of Lower Sacramento Road to the <br /> property across the parcel's frontage. (A $280.00 fee currently is required for processing per <br /> Development Title Table 9-240.2 in addition to a copy of the Grant Deed.) <br /> (Development Title Section 9-1150.5) <br /> 4. The frontage improvements for 10702 Lower Sacramento Road shall be constructed in <br /> conformance with the standards for one-half of a 120-foot right-of-way Major Arterial - <br /> Expressway. The construction of the frontage improvements will be deferred upon execution <br /> by the owner of a Deferred Frontage and Roadway Improvement Agreement or a Secured <br /> Deferred Frontage and Roadway Improvement Agreement with a deposit equivalent to their <br /> estimated construction costs prior to approval of the Improvement Plan. (A $325.00 fee <br /> currently is required for processing per Development Title Table 9-240.2 in addition to a copy of <br /> the Grant Deed and an estimate for the required frontage improvements. The estimate shall <br /> be prepared by a Registered Civil Engineer with a typical section drawing on a form to be <br /> supplied by the Department of Public Works and submitted to the Department of Public Works <br /> for approval. As an option, the Department of Public Works will prepare the drawing and <br /> estimate for an additional fee of $140.00.) <br /> (Development Title Section 9-1150.2) <br /> 5. The Traffic Impact Mitigation Fee will be required for this development. The fee is due and <br /> payable at the time of building permit application. (The fee currently is $174.59 per daily <br /> trip-end generated in the Stockton area. The fee shall be automatically adjusted July 1 of <br /> each year by the Engineering Construction Cost Index as published by the Engineering News <br /> Record. A credit may be allowed if it can be verified that the existing development on this site <br /> was in operation on or after April 23, 1990.) <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-1791 R-95-650, and R-96-592) <br /> 6. The Water Supply Facilities Impact Mitigation Fee will be required for this development. The <br /> fee is due and payable prior to issuance of the building permit. The fee currently is $403.00 <br /> per 1,000 gross square foot of building as Commercial Service. The fee shall be automatically <br /> increased on January 1 of each year through the year 2005 at the rate of 7.66 percent. A <br /> credit may be allowed if it can be verified that the existing development on this site was in <br /> operation on or after April 30, 1991. <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, R-94-185, and R-97-5) <br /> 7. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 8. Verification shall be obtained from the Solid Waste Division (468-3066) that this development <br /> has addressed the items on the attached Waste Plan Format for Development Projects. Final <br /> Site Plan is required upon submittal of verification. <br /> 9. A traffic study is required for this development. The developer shall pay the cost of the traffic <br /> study plus an administration fee. <br /> GK:BN:tee <br /> PS-1 C0 5-EtC <br />
The URL can be used to link to this page
Your browser does not support the video tag.