Laserfiche WebLink
A <br /> JAMES D ROBINSON,PE, CEG Page 8 <br /> September 1, 2010 <br /> Project Number 2010-1015 <br /> Mitigation methods <br /> No mitigation methods or measures are necessary for the septic system do to the results of <br /> the study. No further mitigation measures are needed. <br /> 5. CONCLUSIONS AND RECOMMENDATIONS <br /> ]3 <br /> 1 <br /> The results of the Nitrate Loading Study indicate that the development of the site with a <br /> Islamic Center with the use of a standard septic system for the restroom will not cause significant <br /> additional impacts to the groundwater. The standard septic system should follow the San <br /> Joaquin County On-Site Wastewater Disposal Standards. <br /> Professional Signature <br /> It has been a pleasure to be of service. If any questions arise, please contact our office. <br /> Sincerely, <br /> ZAIr OHO <br /> I ! <br /> JAMES D. <br /> RomtisoN <br /> a. No 2441 <br /> James D Robinson 0 • <br /> cERfir!"IED <br /> ENGINEERING � <br /> ' GEGLOGIS7 ' <br /> RE 69045, C.E.G. 2441, P.G. 7834 y9��Or Cpl.'��a� <br /> - I <br /> 6. LIMITATIONS <br /> This report is applicable only for the project.and site studied. Report findings and <br /> statements of professional opinion do not constitute a guarantee or warranty, expressed or <br /> implied. This report contains information and data provided by others and James D, Robinson in <br /> no way warrants the accuracy or completeness of the information provided by those sources. <br /> Our services are performed in a manner consistent with the level of care and skill ordinarily <br /> JAMES D ROBINSON,PE,CEG ENVIRONMENTAL•ENGINEERING•GEOLOGY <br /> PHONE(209)642-5445•FAX(209)740-4303 <br />