Laserfiche WebLink
e <br /> - aPAY.Iry, c <br /> Wif <br /> THOMAS M.GALI ��{qy" P.O.BOX 1810.1810 E.HAZELTON AVENUE <br /> DIRECTOR ,,�U'-� STOCKTON,CALIFORNIA 95201 <br /> (209)468-3000 FAX(209)468.2999 <br /> •.d,. Q.• w .slgov.org/puborks <br /> FRITZ BUCHMAN Warkilig for YOU <br /> DEPUTY DIRECTOR <br /> MICHAEL SELLING <br /> DEPUTY DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> ROGER JANES <br /> BUSINESS ADMINISTRATOR <br /> March 20,2012 <br /> MEMORANDUM <br /> TO: John L.Funderburg,Principal Planner <br /> Community Development Department <br /> CONTACT PERSON: Rick Griffin <br /> Alex Chetley,Engineer V //X/ <br /> Public Services Division � <br /> SUBJECT: PA-1200003;A Site Approval application for a landscaping services business inside an existing <br /> 2,520-square-foot metal building and a request to permit a wooden fence instead of a masonry wall <br /> as required per Development Title Section 9-1022.4(d)Screening; located on the West side of Lower <br /> Sacramento Road approximately 100 feet north of Taylor Road,west of the City of Lodi. <br /> (Supervisorial District 4) <br /> PROPERTY OWNER: Frances Wicks APPLICANT:David Miraflor <br /> ADDRESS: 15417 N.Lower Sacramento Road,Lodi APN: 027-060-28 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> Lower Sacramento Road has an existing right-of-way width of 110 feet and is located with the limits of the City of <br /> Lodi. The planned right-of-way will be determined by the City of Lodi. <br /> RECOMMENDATIONS: <br /> 1. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. The fee shall be automatically adjusted July I of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record.(Resolution R-00-433) <br /> 2. The Regional Transportation Impact Fee shall be required for this development. Tile fee is due and payable at <br /> the time of building permit application.The fee will be based on the current schedule at the time of payment. <br /> (Resolution R-06-38) <br /> 3. Verification shall be obtained from the Solid Waste Division (468-3066) that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon submittal <br /> of verification. <br />