Laserfiche WebLink
oPquly O <br /> a - P.O.BOX 1810-1810 E.HAZELTON-AVENUE <br /> STOCKTON,CALIFORNIA 95201 <br /> 6 (209)468-3000 FAX(209)468-2999 <br /> www.sjgov.org/pubworks <br /> MICHAEL SELLING <br /> DEPUTY DIRECTOR <br /> FRITZ BUCHMAN f0T <br /> DEPUTY DIRECTOR RECEIVED <br /> JIM STONE <br /> DEPUTY DIRECTOR <br /> ROGER JANES �� 2 �� 5 <br /> BUSINESS ADMINISTRATOR <br /> San Joaquin County <br /> Community Development <br /> April 27,2015 <br /> MEMORANDUM <br /> TO: John L. Funderburg, Principal Planner <br /> Community Development Department <br /> CONTACT PERSON: Megan Aguirre <br /> FROM: Alex Chetley, Engineering Services Manager ' <br /> Development Services Division <br /> SUBJECT: PA-1500048; A Minor Subdivision application to subdivide two parcels into nine parcels and a <br /> designated remainder parcel. Each parcel to contain a minimum of 20 acres; located on the <br /> northeast corner of N. Lower Sacramento Road and E. Woodbridge Road,Acampo. <br /> (Supervisorial District 4) <br /> PROPERTY OWNER: Aberle Acres, Inc. APPLICANT: Quartaroli &Associates, Inc. <br /> ADDRESS: 19750 N. Lower Sacramento Road APN: 013-180-50 thru 013-180-53 <br /> INFORMATION: <br /> The site is not currently located within a Federal Emergency Management Agency Designated Flood Hazard <br /> Area. <br /> N.Lower Sacramento Road has an existing right-of-way width of 80 feet and a planned right-of-way width of 84 <br /> feet. <br /> E. Woodbridge Road has an existing right-of-way width of 60 feet and a planned right-of-way width of 60 feet. <br /> The Traffic Impact Mitigation Fee shall be required when parcels are developed. The fee is due and payable at <br /> the time of building permit application. <br /> The Regional Transportation Impact Fee will be required when parcels are developed. The fee is due and payable <br /> at the time of building permit application. <br />