Laserfiche WebLink
City of Galt <br /> In a memo dated November 10, 2005, the City of Galt expressed opposition to the proposed development <br /> for the following reasons: <br /> Statements 1 & 5: "The project is proximate to the City of Galt. As such, residents of the project site are <br /> likely to use the city facilities without payment of mitigation to the city to off-set impacts." "The proposed <br /> subdivision will potentially impact traffic projections in the City." <br /> Response: The project will increase the number of vehicles trips on State Route 99, East and West <br /> Frontage Roads, Liberty Road and Lower Sacramento Road due to the proposed number of residential <br /> buildings. A traffic study was completed August 2005 by T.Y. Lin International/CCS, which determined <br /> that the amount of traffic generated as a result of this project is considered to have a significant impact on <br /> the existing level of services (LOS). The study recommended improvements that would result in <br /> acceptable levels of service. To reduce the impacts to less than significant, the Department of Public <br /> Works is recommending the following conditions: <br /> The applicant/developer shall pay a "fairshare° contribution for the improvements of the following <br /> intersections, prior to recording of the Final Map, as follows. <br /> (a) $15,713.00 for the improvements to Liberty Road and Lower Sacramento Road. <br /> (b) $2,970.00 for the improvements to Cost Road and Lower Sacramento Road. <br /> (c) $34,899.00 for improvements to Liberty Road and N. State Route 99 West Frontage Road. <br /> (d) $18,234.00 for improvements to Liberty Road and N. State Route 99 East Frontage Road. <br /> The project is also subject to the Traffic Impact Mitigation Fees and Regional Traffic Impact Fees. <br /> Statement 2: "The density of this agriculture-residential project is too high given the lack of nearby public <br /> services in this location including municipal water, sewer, road maintenance, police, fire protection and <br /> recreational facilities." "It will also be growth inducing." <br /> Response. The parcels have a General Plan designation and Zoning of RIR and R-R (Rural Residential), <br /> respectively. The application is an appropriate land use request because the project is consistent with the <br /> zoning_ The average lot size is greater than one acre and the entire project area [excluding the <br /> "designated remainder"] is 75 08 acres, which results in a density of less than 1 du/ga. The "designated <br /> remainder" is not currently proposed for development. The proposed parcels will be served by the <br /> Sheriff's department and Woodbridge Fire District for police and fire protection. Any recreational and park <br /> fees will be as required by the San Joaquin County Parks and Recreation Department. Additionally, the <br /> General Plan contains policies to limit the creation and expansion of Rural Residential areas. This project <br /> is not anticipated to be growth inducing. The proposal is consistent with the RIR designation of the area. <br /> All other development requirements contained in the Development Title and County standards are <br /> satisfied. <br /> Statement 3: "The proposed subdivision will create an additional load on already limited ground water <br /> supply." <br /> Response As required by the Department of Public Works, a Master Plan for a water system will be <br /> prepared prior to approval of the Final Map. The system shall provide adequate domestic and fire water <br /> supply in conformance to the requirements of the County fire warden and the local Fire District. Water <br /> meters are required to be installed on all water services. (Board of Supervisors Order B-91-650) <br /> San Joaquin County PA-04000741Gudel <br /> Community Development Page 5 <br /> copy <br />