Laserfiche WebLink
WASTE DISCHARGE REQUIREMENTS ORDER N0,R5-2002-0225 <br /> ALPINE PACKING COMPANY,INC. 17 <br /> WASTEWATER TREATMENT SYSTEM, SAN JOAQUIN COUNTY <br /> 5. Wastewater conveyance lines shall be clearly marked as such. Wastewater controllers, valves, <br /> etc., shall be posted with advisory signs; all equipment shall be of a type, or secured in such a <br /> manner, that permits operation by authorized personnel only. <br /> 6. Public contact with wastewater shall be precluded through such means as fences, signs, and <br /> other acceptable alternatives. Signs with proper wording of sufficient size shall be placed at <br /> areas of access and around the perimeter of the land treatment unit to alert the public of the use <br /> of wastewater. <br /> 7. The land treatment unit shall be managed to prevent breeding of mosquitoes. More <br /> specifically: <br /> a. All applied wastewater must infiltrate completely within 24 hours. <br /> b. Ditches not serving as wildlife habitat should be maintained free of emergent, marginal, <br /> and floating vegetation. <br /> c. Low pressure pipelines, unpressurized pipelines, and ditches that are accessible to <br /> mosquitoes shall not be used to store wastewater. <br /> 8. The Discharger may not discharge wastewater to the land treatment unit 24 hours before <br /> predicted precipitation, during periods of precipitation, and for at least 24 hours after cessation <br /> of precipitation, or when soils are saturated. <br /> 9. Application of wastewater to the land treatment unit shall only occur by flood irrigation on <br /> furrows graded so as to achieve uniform distribution, minimize ponding and provide for <br /> tailwater control. Furrow runs shall be no longer and slopes shall be no greater than what <br /> permits reasonably uniform infiltration and maximum practical irrigation efficiency. The <br /> minimum furrow slope shall not be less than 0.2%. Application by sprinkler is acceptable if <br /> the land treatment unit has been prepared and if the application complies with all other <br /> requirements of this order. <br /> 10. The land treatment unit shall be allowed to dry for at least 72 hours from the end of wastewater <br /> application unless more frequent irrigation is required for crop health. <br /> 11. Application of wastewater to the land treatment unit shall be performed in accordance with the <br /> approved LTU Operation and Maintenance Plan submitted pursuant to the provisions. <br /> 12. There shall be no standing water in the land treatment unit 24 hours after wastewater is applied, <br /> except during periods of heavy rains sustained over two or more consecutive days. <br /> 13. The wastewater discharge shall not occur within a 50-foot wide buffer zone along any property <br /> lines adjacent to properties developed with residences. <br /> 14. The resulting effect of the wastewater discharge on the soil pH shall not exceed the buffering <br /> capacity of the soil profile. <br />