Laserfiche WebLink
MONITORING AND REPORTING PROGRAM NO.R5-2002-0225 -5- <br /> ALPINE PACKING COMPANY,INC. <br /> WASTEWATER TREATMENT FACILITY <br /> SAN JOAQUIN COUNTY <br /> 1. Results of industrial wastewater and industrial wastewater pond effluent, wastewater pond, <br /> land treatment unit, and solids disposal monitoring; <br /> 2. A comparison of monitoring data to the discharge specifications and an explanation of any <br /> violation of those requirements. Data shall be presented in tabular format; <br /> 3. If requested by staff, copies of laboratory analytical report(s); <br /> 4. A calibration log verifying calibration of all hand held monitoring instruments and devices <br /> used to comply with the prescribed monitoring program; <br /> 5. The total pounds of total dissolved solids (year to date) that have been applied to the land <br /> treatment unit, as calculated from the sum of the monthly loadings; and <br /> 6. The total pounds of nitrogen in fertilizer applied to the land treatment unit for the month. <br /> B. Quarterly Report <br /> The Discharger shall establish a quarterly sampling schedule for groundwater monitoring such that <br /> samples are obtained approximately every three months. Quarterly monitoring reports shall be <br /> submitted to the Board by the 1" day of the second month after the quarter (i.e. the January- <br /> March quarter is due by May 1S) each year. The results of regular monthly monitoring reports for <br /> March, June, September, and December may be incorporated into their corresponding quarterly <br /> monitoring report. The Quarterly Report shall include the following: <br /> 1. Results of groundwater monitoring and vadose zone monitoring(when applicable); <br /> 2. A narrative description of all preparatory, monitoring, sampling, and analytical testing <br /> activities for the groundwater monitoring. The narrative shall be sufficiently detailed to <br /> verify compliance with the WDR, this MRP, and the Standard Provisions and Reporting <br /> Requirements. The narrative shall be supported by field logs for each well documenting <br /> depth to groundwater; parameters measured before, during, and after purging; method of <br /> purging; calculation of casing volume; and total volume of water purged; <br /> 3. Calculation of groundwater elevations, an assessment of groundwater flow direction and <br /> gradient on the date of measurement, comparison of previous flow direction and gradient <br /> data, and discussion of seasonal trends if any; <br /> 4. A narrative discussion of the analytical results for all groundwater locations monitored <br /> including spatial and temporal tends, with reference to summary data tables, graphs, and <br /> appended analytical reports (as applicable); <br /> 5. A comparison of monitoring data to the groundwater limitations and an explanation-of any <br /> violation of those requirements; <br /> 6. Summary data tables of historical and current water table elevations and analytical results; <br /> 7. When applicable (Le., for the second and fourth quarterly reports): <br /> a. A narrative description of all preparatory, monitoring, sampling, and analytical testing <br /> activities for vadose zone monitoring. The narrative shall be sufficiently detailed to <br /> verify compliance with the WDR, this MRP, and the Standard Provisions and Reporting <br />