Laserfiche WebLink
Monitoring Well Installation Workplan - 3 - <br /> Monit'Ioring Well Installation Report <br /> Boring diameter <br /> Casing diameter <br /> i; Casing material <br /> Size of perforations <br /> Number of bags of sand <br /> Well elevation at top of casing <br /> Depth to ground water <br /> Date of water level measurement <br /> Monitoring well number <br /> Date drilled <br /> i Location <br /> ki <br /> B. ;Weil Development: <br /> Date(s) of development of each well <br /> If Method.of development <br /> Volume of water purged from well <br /> j How well development completion was determined <br /> Method of effluent disposal <br /> Field notes from well development should be included in report. <br /> C. I,iWell Surveying:' provide reference elevations for each well and surveyor's notes <br /> �i p " <br /> D.IIWater Sampling: <br /> i Date(s)of sampling <br /> E How well was purged <br /> How many well volumes purged <br /> Levels of temperature, EC, and pH at stabilization <br /> Sample collection, handling, and preservation methods <br /> Sample identification <br /> ii Analytical methods used <br /> Laboratory analytical data sheets <br /> �j Water level elevation(s) <br /> Groundwater contour map <br /> E. Soil Sampling (if applicable): <br /> ii Date(s) of sampling <br /> i Sample collection, handling, and preservation method <br /> j Sample identification <br /> 1 Analytical methods used <br /> Laboratory analytical data sheets <br /> ;y <br /> I <br /> �I <br /> �. GH.EYDxvnimylWyefsD'HrimWtxhU.d- <br />