Laserfiche WebLink
WASTE DISCHARGE REQUIREMENTS ORDER NO. Iq <br /> ALPINE PACKING COMPANY,INC. <br /> WASTEWATER TREATMENT SYSTEM, SAN JOAQUIN COUNTY <br /> on total annual precipitation using a return period of 100-years, distributed monthly in <br /> accordance with historical rainfall patterns. <br /> 11. Freeboard in any pond shall never be less than two feet as measured from the water surface to <br /> the lowest point of overflow. <br /> 12. On or about 15 October of each year, available pond storage capacity shall at least equal the <br /> volume necessary to comply with Discharge Specifications B.10 and B.11. <br /> C. Effluent Limitations <br /> I. The maximum total nitrogen loading to the land application area shall not exceed the <br /> agronomic rate for Plant Available Nitrogen (PAN) for the type of crop to be grown, as <br /> specified in the most recent edition of the Western Fertilizer Handbook. PAN shall be <br /> calculated as 100% of the total nitrogen content of the waste, unless and until the Discharger <br /> demonstrates that another proportion is technically justified, as described in Provision G.6. <br /> 2. The maximum BODS loading to the land application area shall not exceed any of the <br /> following unless and until the Discharger demonstrates that another proportion is technically <br /> justified, as described in Provision G.5: <br /> a. 300 lbs/acre-day on any single day; <br /> b. 100 lbs/acre-day as a 7-day average; <br /> c. The maximum loading rate that ensures that the discharge will not create a nuisance. <br /> 3. The wastewater discharged to the land application area shall not have a pH of less than 6.5 or <br /> greater than 8.5. <br /> D. Land Application Area Requirements: <br /> 1. The discharge shall be.distributed uniformly on adequate acreage in compliance with the <br /> Discharge Specifications and Effluent Limitations. <br /> 2. Crops shall be grown on the application area. Crops shall be selected based on nutrient <br /> uptake capacity, tolerance to high soil moisture conditions, and consumptive use of water and <br /> irrigation requirements. Cropping activities shall be sufficient to take up all the nitrogen <br /> applied. Crops shall be harvested and removed from the application area. <br /> 3. Hydraulic loading of wastewater and irrigation water shall be at reasonable agronomic rates <br /> designed to minimize the percolation of process wastewater and irrigation water below the <br /> root zone (i.e., deep percolation) <br /> 4. The discharge of process wastewater, including runoff, spray or droplets from the irrigation <br /> system, shall not occur outside the boundaries of the land application area. <br /> ho <br /> CAFrojmt HmI SitesWpine PackingkNVMLdoc <br />