Laserfiche WebLink
r Chandler Martin -2- <br /> COMMENTS ON DEVELOPMENT <br /> PA-05-645 (MS) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. (The fee currently is$1,992.00 per 1000 gross square foot of building <br /> designated as Office in the Stockton area. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record. (Resolutions R-00-433) <br /> 4. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee is due and <br /> payable prior to issuance of the building permit. (The fee currently is$597.00 per 1,000 gross square foot of <br /> building designated as Office. The fee shall be automatically increased on January 1 of each year through <br /> the year 2005 at the rate of 7.66 percent. A credit may be allowed if it can be verified that the existing <br /> development on this site was in operation on or after April 30, 1991.) <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, R-94-185 and R-97-5) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> MRC:SH:ar <br /> P:COAII.93i`ITS\OP\YR 200APA-0S00665.wpd <br />