My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005669
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MOURFIELD
>
3858
>
2600 - Land Use Program
>
PA-0500645
>
SU0005669
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:31:42 AM
Creation date
9/6/2019 11:11:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0005669
PE
2625
FACILITY_NAME
PA-0500645
STREET_NUMBER
3858
Direction
S
STREET_NAME
MOURFIELD
STREET_TYPE
AVE
City
STOCKTON
APN
17524027
ENTERED_DATE
10/6/2005 12:00:00 AM
SITE_LOCATION
3858 S MOURFIELD AVE
RECEIVED_DATE
10/5/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MOURFIELD\3858\PA-0500645\SU0005669\APPL.PDF \MIGRATIONS\M\MOURFIELD\3858\PA-0500645\SU0005669\CDD OK.PDF \MIGRATIONS\M\MOURFIELD\3858\PA-0500645\SU0005669\EH COND.PDF \MIGRATIONS\M\MOURFIELD\3858\PA-0500645\SU0005669\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r Chandler Martin -2- <br /> COMMENTS ON DEVELOPMENT <br /> PA-05-645 (MS) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. (The fee currently is$1,992.00 per 1000 gross square foot of building <br /> designated as Office in the Stockton area. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record. (Resolutions R-00-433) <br /> 4. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee is due and <br /> payable prior to issuance of the building permit. (The fee currently is$597.00 per 1,000 gross square foot of <br /> building designated as Office. The fee shall be automatically increased on January 1 of each year through <br /> the year 2005 at the rate of 7.66 percent. A credit may be allowed if it can be verified that the existing <br /> development on this site was in operation on or after April 30, 1991.) <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, R-94-185 and R-97-5) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> MRC:SH:ar <br /> P:COAII.93i`ITS\OP\YR 200APA-0S00665.wpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.