My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0008111
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MUNFORD
>
2823
>
2600 - Land Use Program
>
PA-1000027
>
SU0008111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:21 AM
Creation date
9/6/2019 11:11:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0008111
PE
2631
FACILITY_NAME
PA-1000027
STREET_NUMBER
2823
Direction
E
STREET_NAME
MUNFORD
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
17910014
ENTERED_DATE
2/23/2010 12:00:00 AM
SITE_LOCATION
2823 E MUNFORD AVE
RECEIVED_DATE
2/19/2010 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MUNFORD\2823\PA-1000027\SU0008111\APPL.PDF \MIGRATIONS\M\MUNFORD\2823\PA-1000027\SU0008111\CDD OK.PDF \MIGRATIONS\M\MUNFORD\2823\PA-1000027\SU0008111\EH COND.PDF \MIGRATIONS\M\MUNFORD\2823\PA-1000027\SU0008111\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDITIONS OF APPROVAL <br /> PA-1000027 <br /> Pyle <br /> Site Approval Application No. PA-1000027 was approved by the San Joaquin County Community <br /> Development Department on April 5, 2010. The effective date of approval is April 15, 2010. This <br /> approval will expire on October 15, 2011, which is 18 months from the effective date of approval, <br /> unless (1) all Conditions of Approval have been complied with, (2) all necessary building permits <br /> have been secured and remain in force, and (3) all necessary permits from other agencies have <br /> been secured and remain in force. <br /> Unless otherwise specifier!, all Conditions of Approval and Ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as Ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other Ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Contact Staff. Mo Hatef, [209]468-8477) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage, driveway access details including gates, on-site <br /> parking, landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE <br /> PLAN CHECK LIST" for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884) <br /> b. APPROVEUUSE: This approval is to construct a 120-foot tall monopole communications tower and <br /> a 3,600 square foot equipment lease area as shown on the site plan dated February 16, 2010. (Use <br /> Type: Communication Services-Type I1). <br /> c. SETBACKS: The structure shall comply with the following setback requirements: <br /> (1) The proposed tower and accompanying equipment shelter shall be set back a minimum of thirty <br /> (30)feet from the front property line. (Development Title Table 9-510.3) <br /> (2) New freestanding support structures shall be located a distance equal to at;least the height of <br /> the said structure from residential structures on adjoining properties. (Development Title Section <br /> 9-1065.4id]) <br /> d. MAINTENANCE OF FACILITIES: All freestanding structures, antennas, and supporting equipment <br /> associated with wireless telecommunication shall be maintained in good condition by the provider of <br /> the telecomrhunication facility and, whenever necessary, repaired or replaced. (Development Title <br /> Section 9-1065.7) <br /> J <br /> e. REMOVAL bF FACILITIES: Freestanding structures, antennas, and supporting equipment <br /> associated with wireless telecommunication shall be removed by the provider of such facilities and <br /> the site restored to its pre-construction state if said facilities have not been operational or used for a <br /> period of six.(6) consecutive months. Removal and site restoration shall be completed within ninety <br /> (90) days of the end of said six(6) month period. (Development Title Section 9-1065.8) <br /> Conditions of Approval - 1 - PA-1000027 <br />
The URL can be used to link to this page
Your browser does not support the video tag.