Laserfiche WebLink
I <br /> i <br /> Rick Griffin -2- " <br /> COMMUNITY DEVELOPMENT <br /> PA-1000027(SA) <br /> v <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the, <br /> time of building permit application..The fee shall be automatically adjusted July I of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record. (Resolution R-00-433) <br /> 4. The Regional Transportation Impact Fee shall be required for this development. The fee is due and payable at <br /> the time of building permit application. The fee will be based on the current schedule at the time of payment. <br /> (Resolution R-06-38) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit and shall delineate the <br /> distance of the proposed structure(s)to the Designated Flood Hazard Area. <br /> 6. Verification shall be obtained from the Solid Waste Division (468-3066) that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon submittal <br /> of verification. I <br /> Informational Notes: <br /> (i) All future building permits for projects located within a Special.Flood Hazard Area at the time-of permit <br /> issuance shall meet the San Joaquin County flood hazard reduction requirements(Title 9, Chapter 9-1605) <br /> and all requirements of the State of California(CCR Title 23)that are in force at the time of permit issuance. <br /> As an example, these requirements may include raising the finish floor elevation one foot above the expected f <br /> flood level and/or using flood resistant materials. <br /> AC:BD:DS 4. <br /> 11Sjpwgov.orglshares\DcvServices\DPubServICOMMENTS1SA\YR 20101PA-10000271PA-1000027.doc <br /> I <br /> I <br /> I <br /> 1 <br />