Laserfiche WebLink
Pp U,iN <br /> COUNTY OF SAN JOAQUIN THOMAS R.FLINN <br /> " DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> P.O. BOX 1810- 1810 E. HAZELTON AVENUE <br /> • �7<j p0(1N\P STOCKTON,CALIFORNIA 95201 THOMAS M.GAU <br /> (209)468-3000 DEPUTY DIRECTOR <br /> MANUEL LOPEZ FAX(209)468-2999 <br /> DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> February 21, 2001 <br /> REC�11/� <br /> MEMORANDUM FEB 22200, <br /> TO: Kerry Sullivan, Deputy Director COmmun/tYDeVe/00rneDe <br /> Community Development Department nt <br /> CONTACT PERSON: Jennifer Jolley pf <br /> FROM: f Gabriel Karam, Senior Civil Engineer 13 t!1a <br /> h/L' / <br /> Public Services Division <br /> SUBJECT: SA-01-07 A SITE APPROVAL APPLICATION TO CONSTRUCT A <br /> 72 SQUARE-FOOT WALK-IN TELECOMMUNICATION CABINET TO <br /> HOUSE TELCO SWITCHING EQUIPMENT THAT PROVIDES TELEPHONE <br /> SERVICES, LOCATED ON THE SOUTHWEST CORNER OF <br /> SANTOS AVENUE AND MURPHY ROAD. (DISTRICT 5). <br /> APPLICANT: Ripon Unified School District APN: 245-180-35 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated <br /> Flood Hazard Area. <br /> Murphy Road has an existing right-of-way width of 60 feet and a planned right-of-way width <br /> of 60 feet. Santos Avenue has an existing right-of-way width of 40 feet and a planned <br /> right-of-way width of 50 feet. <br /> RECOMMENDATIONS: <br /> 1. Encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. The driveway approach shall be improved in accordance with the requirements of <br /> San Joaquin County Standards R-17 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $606.00 per <br /> 1,000 gross square foot of building designated as Manufacturing generated in the <br /> Stockton area. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record.) A <br /> credit may be allowed if it can be verified that the existing development on this site was in <br /> operation on or after April 23, 1990. <br /> (Resolution R-00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> GK:BN:mr <br /> PS-15107-MlE <br /> E: Thomas M. Gau, Deputy Director/Development <br />