Laserfiche WebLink
S = Sufficient <br /> 1 = Insufficient <br /> S I 6.0 PERCOLATION TEST INFORMATION SECTION <br /> ❑ 6.1 Site map showing the location,wit oncise and accurate dimensions of the percolation test holes on the parcel. <br /> a <br /> �x � <br /> ® ❑ 6.2 The minimum number of shallow d d6�ep percolation tests was performed for each parc<j `f) <br /> ❑ 6.3 Description of the date, time and protocol used to prepare the test hole, including depth and dimensions of hole, <br /> preparation of hole, and depth of water used to presoak (minimum 12 inchesL -rI <br /> F] ❑ 6.4 Description of the date,time and condition of the test hole after the 24-hour soak period (hole still intact, hole dry, <br /> depth to water remaining in hole, etc.)(wi) <br /> 0 ❑ 6.5 The test conformed to SJC Policy D 02-02 (correct depth, diameter, 2" gravel, 6"water refill, correct readings <br /> record�d).r�y� <br /> ❑ 6.6 Complete Percolation Test Form (including re ings)was provided with REHS verification signature. The rate <br /> was correctly calculated using the last readir <br /> Pq F-16.7 Discussion of any potential problems redicted aan1199d''/''o__rr the need for an engineered or alternative septic system. <br /> ❑ El 6.8 Discussion of percolation rates in rel '`n to t type, size and location of future leach fields needed at the site. <br /> J <br /> 7.0 CONCLUSION SECTION <br /> ❑ 7.1 The report was signed and stamped by the appropriately registered individual fa t <br /> Reviewed By: Reviewed Date: �O,Z <br /> EHD 26-02-003 Page 2 of 3 Soil Suitability Checklist <br />