Laserfiche WebLink
John Funderburg 2 <br /> Community Development Department <br /> PA-1100127 <br /> RECOMMENDATI©NS: <br /> 1. A Parcel Map is required. (Development Title Section 9-915.2) <br /> 2. The remainder parcel shall be designated and labeled as "Designated Remainder" on the Parcel <br /> Map. (Subdivision Map Act Section 66445) <br /> 3. All easements of record shall be shown on the Parcel Map. (Development Title Section 9-910.20) <br /> 4. A twenty-five(2 5)foot wide proposed private access and utility easement shall be provided for the benefit <br /> of Parcel 1.The requirement for this easement shall be noticed by a statement on the Parcel Map and by a <br /> recorded Notice of Minor Subdivision Restriction. The statement shall read as follows: <br /> We also hereby make an irrevocable offer to provide a 25-foot wide private access and utility easement <br /> across the"Designated Remainder"for the benefit of Parcel 1 upon conveyance of the"Designated <br /> Remainder"and/or Parcel I to another party. Said easement is not created by this map. <br /> Informational Notes: <br /> (i) Any construction activity that results in the disturbance of at least one(1)acre of soil shall require a State <br /> NPDES construction permit. Dischargers whose projects disturb 1 or more acres of soil or whose projects <br /> disturb less than I acre of soil and is not part of a larger common plan of development, are required to <br /> obtain coverage under the current General Permit for Discharges of Storm Water Associated with <br /> Construction Activity(%vww.sNvreb.ca.gov/stornnvtz•Iger>vconst,irtnilgconst—petillit). <br /> (ii.) All future building permits for projects located within a Special Flood Hazard Area at the time of permit <br /> issuance shall meet the San Joaquin County flood hazard reduction requirements(Title 9,Chapter 9-1605) <br /> and all requirements of the State of California(CCR Title 23)that are in force at the time of permit <br /> issuance. As an example,these requirements may include raising the finish floor elevation one foot above <br /> the expected flood level and/or using flood resistant materials, <br /> AC:DS <br /> 11SJptirgov,orglsltoreslDetiSerTiceslDPtrbServlCOdfAfEAr1SUIMYR 20111Pr1-1100127TH-1100127.com <br />