Laserfiche WebLink
08/0812611 14: 24 2092494642 SSJID ENGINEERING PAGE .03/03 <br /> 0 <br /> the map,gives constructive notice to title companies,fixture property buyers and the <br /> public of the requirement to provide a private irrigation casement as well as its size <br /> and location. <br /> b. Obtain a structure permit for new service structure connections to District facilities <br /> which are necessary to provide service to the new parcels. <br /> c_ The design strength and diameter of the proposed private pipelines and structures <br /> shall be adequate to handle standard delivery heads or flows for that area. <br /> If a recorded map is not required, the above stated conditions shall be recorded in <br /> conjunction with the recording of deeds for the Rewly created parcels. <br /> 3. The owner shall grant easelnents of sufficient width for all District facilities which may <br /> exist on subject property to serve as a replacement for any prescriptive and/or unrecorded <br /> easements that are present. All existing recorded or newly dedicated District easements <br /> shall be shown and identified on the survey map prior to its recording. if a map is not <br /> required, easements shall be recorded by separate instrument concurrent with the <br /> recordation,of new deeds. <br /> 4. Owner shall obtain an Encroacbmeut Pemait from District for fencing or any other <br /> proposed encroachments of District easements resulting from the proposed parcel split. <br /> Owner shall provide District with unrestricted access to its pipeline and control structures_ <br /> 5. if a proposed hom,esite or buildiutg area is lower than adjacent irrigated property, a <br /> penrianeat berm or ditch will need to be constructed around the homesite parcel or <br /> building site,to prevent accidental flooding from irrigation water. Property owner shall <br /> either verify field elevations or submit a written statement to District indicating that <br /> property in question is not subject to flooding from adjacent irrigated property or <br /> pipelines. Likewise, owner shall provide the District with a written statement or <br /> explanation if any of the above stated conditions do not pertain to the situation involving <br /> the proposed minor subdivision.. <br /> $. A copy of tate survey map, if required, shall be provided to the District Engineering <br /> Department for review to ensure that the above conditions have been satisfied. <br /> If you have any questions,please contact me in the Engineering Department at(249)249-4617. <br /> 'V'ery truly yours, <br /> Sam Bologna. <br /> Engineering Depaartme. t Manager <br /> 2 <br />