Laserfiche WebLink
LIVE OAK GEO ENVIRONMENTAL, INC. <br /> 407 W. Oak St., Lodi, CA 95240 + (209) 369-0375 4 logelodi.com Q'� ` ,EV ry�pq� <br /> December 10, 2012 RECEIVED <br /> Transmitted by U.S. Mail <br /> Project Number. 1103 DEC 17 2012 <br /> Ted Tasiopoulos ENVIRONMENTAL HEALTH <br /> San Joaquin County Environmental Health Department PERMITISERVICES <br /> 1868 E. Hazelton Ave. <br /> Stockton, CA 95205 <br /> Regarding. Addendum to Soil Suitability Study <br /> Van Elderen Property <br /> 19238 E. Highway 120, Ripon, CA <br /> PA-1100208 <br /> Original report completed February 4, 2011 <br /> Dear Mr. Tasiopoulos, <br /> When Mr. Van Elderen originally retained our office to prepare a Soil Suitability Study, the <br /> above property was to be divided into one parcel and a designated remainder. However, since <br /> the completion of our Soil Suitability Study, a second numbered parcel has been added to the <br /> project. As a result, we have completed a new percolation test for the project. <br /> One shallow percolation test was conducted on the Site. Percolation test procedures <br /> conformed to San Joaquin County Environmental Health Department policy. <br /> Soil Boring <br /> On December 4, 2012, Live Oak excavated one shallow soil boring on the Site for the purpose <br /> of conducting a percolation test. The boring was four inches in diameter, 3.35 feet deep, and <br /> was excavated by hand auger. The soil in the boring was observed to be silty, fine sand to the <br /> maximum depth of the boring_ The boring location is indicated on the attached plate. <br /> Preparation and Presaturation of Per Test Hole <br /> After the boring was advanced by hand auger, the test hole was completed for the percolation <br /> test. Approximately one Inch of pea gravel was placed in the bottom of the open soil boring, <br /> followed by a 1.5-inch diameter PVC pipe with perforations on the bottom. Pea gravel was <br /> then used to backfill a few inches of the annular space. <br /> Live Oak presaturated the percolation test hole approximately 24 hours prior to the percolation <br /> test. The hole was filled with water to a height of 12 inches above the bottom of the boring for <br /> the presaturation. On the day of testing. the shallow hole was found to be intact and dry. <br /> Environmental <• Engineering Geology : Geophysics <br /> Received Time Dec, 17. 2012 10: 34AM No. 1878 <br />