Laserfiche WebLink
S = Sufficimt <br /> I = Insufliciwt <br /> S I 6.0 PERCOLATION TEST INFORMATION SECTION <br /> ❑ 6.1 Site map showing the location, with concise and accurate dimensions of the percolation test holes on the parcel. <br /> G <br /> ® ❑ 6.2 The minimum number of shallow and deep percolation tests was performed for each parcel. <br /> 1�1 ID 6.3 Description of the date,time and protocol used to prepare the test hole, including depth and dimensions of hole, <br /> preparation of hole, and depth of water used to presoak(minimum 12 inches). <br /> G <br /> ® ❑ 6.4 Description of the date, time and condition of the test hole after the 24-hour soak period (hole still intact, hole dry, <br /> depth to water remaining in hole, etc.) <br /> ® ❑ 6.5 The test conformed to SJC Policy EHD 02-02(correct depth, diameter, 7'gravel, 6"water refill, correct readings <br /> recorded). / <br /> ❑ 6.6 Complete Percolation Test Form (including readings)was provided with REHS verification signature. The rate <br /> was correctly calculated using the last reading. <br /> 0 ❑ 6.7 Discussion of any potential problems predicted and/or the need for an engineered or alternative septic system. <br /> ® ❑ 6.8 Discussion of percolation rates in relation to the type, size and location of future leach fields needed at the site. <br /> 7 <br /> 7.0 CONCLUSION SECTION <br /> ❑ 7.1 The report was signed and stamped by the appropriately registered individual <br /> Reviewed By: S, Reviewed Date: 14 <br /> EHD 26-02-003 Page 2 of 3 Soil Suitability Checklist <br />