24 . Describe methods , sequence, and timing for bringing <br /> reclamation of the land to its end state . Indicate on the <br /> -" site plan , or on diagrams as necessary . <br /> The soil salvaged from the project area will be placed in <br /> conformance with the conditions of the Conditional Use Permit <br /> governing the subsequent use . In the absence of such a permit , <br /> the soil will be spread in relatively uniform depths on areas <br /> adjacent to the pond that will remain after mining . <br /> The sand washing screen plant will be removed and the site <br /> reclaimed upon completion of excavation operations . Reclamation <br /> will involve the continued construction of the golf course and <br /> recreational facility including smoothing the topsoil layer , <br /> adding topsoil as necessary from the stockpile, and grading in <br /> preparation for the planned subsequent use . <br /> The final topography will be contoured mounds and hillocks that <br /> conform to the construction of the subsequent use facility . <br /> Figure 6 show cross sections of the proposed quarry and pond <br /> that will be as shown in these cross sections . The operator <br /> will ensure that the excavation side slopes will be no steeper <br /> than 2 : 1 horizontal to vertical . <br /> 25 . If applicant plans short-term phasing of reclamation , <br /> describe in detail specific reclamation to be accomplished <br /> during first phase : <br /> Reclamation will be accomplished in at the cessation of mining <br /> of the 32 acre pond site . In the event the sand stockpiles <br /> remain at the end of the mining operation , the sand stockpile <br /> sites will be reclaimed as a part of the continued construction <br /> of the golf course after the stockpiles are depleted . <br /> 26 . Describe how reclamation of site in this manner may <br /> affect future mining at the site and in the surrounding area : <br /> Landmark Lathrop Group, LLC <br /> - - 8 - February 3, 2000 <br />