My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004092
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
800
>
2600 - Land Use Program
>
QX-00-0001
>
SU0004092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 4:01:42 PM
Creation date
9/8/2019 12:35:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004092
FACILITY_NAME
QX-00-0001
STREET_NUMBER
800
Direction
E
STREET_NAME
STATE ROUTE 120
City
LATHROP
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
800 E HWY 120
RECEIVED_DATE
1/29/2001 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\O\HWY 120\800\QX-00-01 (PRE- APPLICATION)\SU0004092\CORRESPOND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24 . Describe methods , sequence, and timing for bringing <br /> reclamation of the land to its end state . Indicate on the <br /> -" site plan , or on diagrams as necessary . <br /> The soil salvaged from the project area will be placed in <br /> conformance with the conditions of the Conditional Use Permit <br /> governing the subsequent use . In the absence of such a permit , <br /> the soil will be spread in relatively uniform depths on areas <br /> adjacent to the pond that will remain after mining . <br /> The sand washing screen plant will be removed and the site <br /> reclaimed upon completion of excavation operations . Reclamation <br /> will involve the continued construction of the golf course and <br /> recreational facility including smoothing the topsoil layer , <br /> adding topsoil as necessary from the stockpile, and grading in <br /> preparation for the planned subsequent use . <br /> The final topography will be contoured mounds and hillocks that <br /> conform to the construction of the subsequent use facility . <br /> Figure 6 show cross sections of the proposed quarry and pond <br /> that will be as shown in these cross sections . The operator <br /> will ensure that the excavation side slopes will be no steeper <br /> than 2 : 1 horizontal to vertical . <br /> 25 . If applicant plans short-term phasing of reclamation , <br /> describe in detail specific reclamation to be accomplished <br /> during first phase : <br /> Reclamation will be accomplished in at the cessation of mining <br /> of the 32 acre pond site . In the event the sand stockpiles <br /> remain at the end of the mining operation , the sand stockpile <br /> sites will be reclaimed as a part of the continued construction <br /> of the golf course after the stockpiles are depleted . <br /> 26 . Describe how reclamation of site in this manner may <br /> affect future mining at the site and in the surrounding area : <br /> Landmark Lathrop Group, LLC <br /> - - 8 - February 3, 2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.