My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004092
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
800
>
2600 - Land Use Program
>
QX-00-0001
>
SU0004092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 4:01:42 PM
Creation date
9/8/2019 12:35:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004092
FACILITY_NAME
QX-00-0001
STREET_NUMBER
800
Direction
E
STREET_NAME
STATE ROUTE 120
City
LATHROP
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
800 E HWY 120
RECEIVED_DATE
1/29/2001 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\O\HWY 120\800\QX-00-01 (PRE- APPLICATION)\SU0004092\CORRESPOND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 . Estimate quantity (gallons per day) and quality of <br /> water required by the proposed operation, specifying proposed <br /> sources of this water ; method of its conveyance to the site ; <br /> quantity and quality of used and/or surplus water ; and <br /> disposal of used and/or surplus water : <br /> Approximately 160, 000 gallons per day of make-up will be <br /> required per day to replace that which is captured in the <br /> settled clays and silts and that which remains in the wet sand <br /> stockpile . This water will be extracted from the active mining <br /> pit or will be bled from the dewatering perimeter wells . <br /> 19 . If the nature of the deposit and the mining method <br /> will be phased , describe and show the steps or phases of the <br /> mining operation that allow concurrent reclamation . Include <br /> a proposed time schedule for such concurrent activities : <br /> The project will not be phased other than a mining and <br /> screening operation and a recovery from stockpiles and shipping <br /> operation . It might require more time to ship the mined <br /> materials . In such an event , the mining excavation will <br /> receive the additional construction efforts toward the <br /> completion of the aqua range prior to the depletion of the <br /> stockpiles and reclamation of the stockpile sites . <br /> 20 . Describe the ultimate physical condition of the site <br /> and specify proposed use (s) or potential uses of the mined <br /> lands once reclaimed : <br /> The post-mining use of the land is to be the development of a <br /> golf course and recreational complex subject to the provisions <br /> of a conditional use permit required for such a use (and <br /> included in the overall Use Permit Application) . Remaining <br /> mineral reserves will be preserved under the recreational <br /> facility . Such use is compatible with the zoning and General <br /> Plan designation , and with the Mineral Resources overlay as <br /> provided for in the Surface Mining and Reclamation Act . <br /> Landmark Lathrop Group, LLC <br /> 6 - February 3 , 2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.