My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006656
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
O
>
OLIVE
>
523
>
2600 - Land Use Program
>
PA-0700163
>
SU0006656
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:32:37 AM
Creation date
9/8/2019 12:36:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006656
PE
2622
FACILITY_NAME
PA-0700163
STREET_NUMBER
523
Direction
S
STREET_NAME
OLIVE
STREET_TYPE
AVE
City
STOCKTON
APN
15724306
ENTERED_DATE
7/31/2007 12:00:00 AM
SITE_LOCATION
523 S OLIVE AVE
RECEIVED_DATE
7/31/2007 12:00:00 AM
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\O\OLIVE\523\PA-0700163\SU0006656\APPL.PDF \MIGRATIONS\O\OLIVE\523\PA-0700163\SU0006656\CDD OK.PDF \MIGRATIONS\O\OLIVE\523\PA-0700163\SU0006656\EH COND.PDF \MIGRATIONS\O\OLIVE\523\PA-0700163\SU0006656\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Raymond Hoo -2- <br /> COMMUNITY DEVELOPME� <br /> PA-07-163 (MS) <br /> 5. The frontage improvements for Parcels 1 and 2 shall be constructed in conformance with the standards for one- <br /> half of a fifty(50) foot right-of-way Local Residential Street. The construction of the frontage improvements <br /> will be deferred upon execution by the owner of a Secured Deferred Frontage and Roadway Improvement <br /> Agreement with a deposit equivalent to their estimated construction cost prior to approval of the Parcel Map. <br /> (A $740.00 fee currentlyis required for processing per Development Title Table 9-240.2 in addition to a copy of <br /> the Grant Deed legal descrytions of Parcels 1 and 2 and an estimate. The estimate and legal descriptions shall <br /> be prepared by a registered civil engineer with a typical section drawing on a form to be supplied by the <br /> Department of Public Works and submitted to the Department of Public Works for approval. As an option, the <br /> Department of Public Works will prepare the drawing with estimate for an additional fee of$315.00.) (The fee <br /> due will be based on the current fee schedule.) (Development Title Section 9-1150.2[d][3]) <br /> 6. All traffic signs and markings shall conform to the Manual on Uniform Traffic Control Devices, Caltrans Traffic <br /> Manual and/or San Joaquin County Standards and shall be shown on the improvement plans. (Development <br /> Title Section 9-1150.2) <br /> 7. All improvements shall be in conformance with the current Improvement Standards and Specifications of the <br /> County of San Joaquin. All improvement plans and specifications shall include grading plan for each individual <br /> lot, if applicable. These improvement plans and specifications are subject to plan check, field inspection fees <br /> and must be approved by the County of San Joaquin Department of Public Works prior to approval of the Parcel <br /> Map. (Development Title Section 9-240, Section 9-910, Section 9-1100 and R-92-814) <br /> 8. if impy-evements fefefred to herein will not be eefapleted prior-to r-eeer-ding the Par-eel Map, the subdivider shall <br /> year-aftef appr-oval of the Par-eel Map. (Development Title Seetion 9 1100.3b]) <br /> 8. The project shall be served by a public sewer collection system constructed in conformance with the <br /> requirements of the San Joaquin County Public Health Services Environmental Services Division and the <br /> Department of Public Works. Service shall be provided by East Stockton Sanitary Sewer Project. <br /> (Development Title Section 9-1105.2) <br /> 9. The City of Stockton shall verify that the appropriate Right of Service Units for sanitary sewer have been paid <br /> for the proposed subdivision prior to approval of the Parcel Map or the payment may be deferred until building <br /> permit application with this statement "Payment for the Right of Service Units will be required at the time of <br /> building permit application" noticed on the Parcel Map. (Development Title Section 9-1105.3) <br /> 10. Payment of 0.94 Sewer Main Units to upgrade the existing parcel's capacity to 3.0 units shall be paid to the <br /> County prior to approval of the Parcel Map. The fee is $4,020.46 per unit for a total required fee of$3,898.63. <br /> 11. The project shall be served by a public water system conforming to the requirements of the San Joaquin County <br /> Public Health Services Environmental Health Division and the Department of Public Works. Service shall be <br /> provided by California Water Service Company. (Development Title Section 9-1115.2) <br /> 12. A terminal drainage system shall be provided to meet the requirements of the County and to provide <br /> adequate drainage for the subdivision. Service shall be provided by the East Stockton Drainage System. <br /> The applicant shall submit engineering calculations and a drainage plan showing collection paths and <br /> terminal drainage for review. (Development Title Section 9-1135.3) <br /> 13. This project is located in an area of historic flooding. The finish floor elevation of all new structures and <br /> equipment shall be constructed two (2) feet above immediately adjacent natural grade. <br /> 14. This development may be subject to reapportionment under the San Joaquin Area Flood Control Agency <br /> Assessment District No. 96-1 (Flood Protection Restoration Project). Contact Jenifer Storsteen with <br /> MuniFinancial at (800) 700-6864, extension 1534, to determine if there is a current remaining lien that is <br /> subject to the reapportionment process. Any fees and/or remaining lien payoffs related to the SJAFCA <br /> assessment shall be paid prior to recording of Notice of Lot Line Adjustment/Parcel Map/Final Map. <br /> 15. Grading and construction shall follow the"Small Site Storm Water Management Plan". <br /> DG:DS:av <br /> P.\COMMENTS\MS\YR 200APA-0700163 APPLICATION.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.